Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

IDPX Interior Design Professional Exam Questions and Answers

Questions 4

Any space that is classified as an assembly occupancy MUST have

Options:

A.

the occupancy load posted

B.

a dedicated restroom (washroom)

C.

direct access to the main elevator

Buy Now
Questions 5

What is the standard sequence of events for the permit process?

Options:

A.

inspections, permit issued, preliminary review, temporary occupancy

B.

permit issued, preliminary review, temporary occupancy, inspections

C.

preliminary review, permit issued, inspections, temporary occupancy

D.

temporary occupancy, preliminary review, inspections, permit issued

Buy Now
Questions 6

A designer is working on a joint venture project with a local engineering firm for a large university project. What drawing system will BEST incorporate coordination of project information?

Options:

A.

Facility condition index (FCI)

B.

Building information modeling (BIM)

C.

Project life cycle management (PLM)

D.

Virtual design and construction project manager (VDC)

Buy Now
Questions 7

Which item causes the MOST issues when planning for systems workstations in an office space?

Options:

A.

The workstation cost is too expensive for the client’s budget

B.

The thickness of the panels was not considered when maintaining clearances

C.

The height of the panels is too low to reduce sound from traveling between workstations

D.

The electrical outlets are not maintained at the correct height to accommodate equipment

Buy Now
Questions 8

Where open risers are permitted in a commercial space, what is the MAXIMUM clear space between risers?

Options:

A.

3" [76 mm]

B.

4" [102 mm]

C.

7" [178 mm]

D.

11" [279 mm]

Buy Now
Questions 9

What is one way to reduce indoor air pollutants?

Options:

A.

increase humidity levels

B.

install operable windows

C.

use materials with high VOCs

D.

decrease building temperature

Buy Now
Questions 10

What rating is used to determine a material’s sound absorption?

Options:

A.

CAC

B.

STC

C.

NRC

D.

UL (CSA)

Buy Now
Questions 11

What is the PRIMARY benefit for incorporating a design firm?

Options:

A.

Limit liability of the principals

B.

Shelter company’s profits from taxes

C.

Enhance company availability to credit

D.

Protect company from negligence suits

Buy Now
Questions 12

An office client tells the designer they would like their staff break room to be visible from the reception area to convey a relaxed environment. This request reflects the client’s

Options:

A.

Site

B.

Culture

C.

Budget

D.

Program

Buy Now
Questions 13

The designer attends the weekly progress meetings and is responsible for the meeting minutes. How does the designer ensure that the minutes prepared are accurate?

Options:

A.

Issue a clause in the minutes indicating that minutes are approved and accepted as written

B.

Issue minutes including a clause stipulating minutes will be approved within 24 hours of issue

C.

Issue minutes including a clause enabling attendees to submit revisions within a specified time frame

D.

Issue draft minutes within 24 hours of the meeting, followed by final minutes within 72 hours of meeting completion

Buy Now
Questions 14

What is the MOST important consideration when specifying light fixtures for a retail store?

Options:

A.

Wattage

B.

Indirect glare

C.

Reflected glare

D.

Color rendering index

Buy Now
Questions 15

Which wall section provides for a two-hour fire-rated wall?

Options:

A.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] regular gypsum board applied to each side, 3/8" [9 mm] regular gypsum board applied to each side

B.

Two layers 1/2" [13 mm] metal studs, regular gypsum board applied to each side

C.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] type X gypsum board applied to each side, 1/4" [6 mm] regular gypsum board applied to each side, 2" [50 mm] glass fiber insulation

D.

1 5/8" [41 mm] metal studs, two layers 1/2" [13 mm] type X gypsum board applied to each side, glass fiber insulation

Buy Now
Questions 16

What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

Options:

A.

Work Flow

B.

Gantt Chart

C.

Critical Path Method (CPM)

D.

Program Evaluation Review Technique (PERT)

Buy Now
Questions 17

If the net square footage [m²] is 50,000 square feet [4,645 m²] and usable square footage [m²] is 77,000 square feet [7,154 m²], what is the circulation factor?

Options:

A.

20%

B.

35%

C.

25%

D.

40%

Buy Now
Questions 18

What core information should be captured in the design contract to demonstrate a clear understanding of the physical parameters of the project?

Options:

A.

Property address, usable square footage [m²], and projected use

B.

Room name, client, and occupant load

C.

Room measurements, drawing references, and furniture requirements

D.

Occupant load, circulation ratio, and building classification

Buy Now
Questions 19

Which of the following would allow for ease of reconfiguration of power and data for open office environments?

Options:

A.

access flooring

B.

poke-through system

C.

cellular floor systems

D.

underfloor steel ducts

Buy Now
Questions 20

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

Options:

A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis

Buy Now
Questions 21

Who conducts post-occupancy evaluation interviews?

Options:

A.

Building owner

B.

General contractor

C.

Design professional

D.

Furniture manufacturer

Buy Now
Questions 22

When the owner/contractor agreement is executed, which documents specifically form the contract documents?

Options:

A.

drawings, specifications, instruction to bidders

B.

drawings, specifications, addenda

C.

specifications, addenda, bid (tender) solicitation

D.

addenda, bid (tender) solicitation, instruction to bidders

Buy Now
Questions 23

What is the term for a continuous path of travel from any point in a building or structure to the open air outside at ground level?

Options:

A.

Area of refuge

B.

Exit discharge

C.

Horizontal exit

D.

Means of egress

Buy Now
Questions 24

A restaurant is designated as which occupancy classification?

Options:

A.

public: group P-3

B.

business: group B

C.

restaurant: group R

D.

assembly: group A-2

Buy Now
Questions 25

What is required prior to occupancy to improve indoor air quality?

Options:

A.

clean the air intake vents

B.

run the mechanical system

C.

test carbon monoxide detectors

Buy Now
Questions 26

In an existing non-sprinklered multi-tenant building, a client will be converting a suite from a bank into a restaurant serving more than 49 persons. What fire rating is REQUIRED between the new tenant and the existing adjacent insurance office?

Options:

A.

0

B.

1

C.

2

D.

3

Buy Now
Questions 27

Where allowed by jurisdictional statute, when would an independent interior designer’s seal on drawings be acceptable?

Options:

A.

In combination with an architect’s seal on construction documents

B.

On the life-safety section of the construction documents

C.

In combination with a structural engineer’s seal

D.

On non-structural interior construction documents

Buy Now
Questions 28

During a high school renovation project, the school board and several teachers each call the designer several times a week to request changes. What is the BEST way for the interior designer to keep the project on schedule?

Options:

A.

Send a weekly summary of calls, emails, and meetings to the stakeholders

B.

Ask the client to establish a point person and a clear line of internal decision-making

C.

Set up a weekly meeting with all stakeholders to discuss all of their proposed changes

D.

Talk to each stakeholder and take the time to incorporate all of the changes they request

Buy Now
Questions 29

A university is renovating the restrooms (washrooms) of a dormitory built in 1963 and is required to reduce the water usage by 20%. What is MOST important when specifying plumbing fixtures?

Options:

A.

durability & Green Seal fixtures

B.

cleanability & Energy Star fixtures

C.

accessibility & WaterSense fixtures

D.

sustainability & International Plumbing Code compliant fixtures

Buy Now
Questions 30

During an office renovation, a financial firm wants to continue occupying the space while maintaining daily functions. What is the BEST method for the designer to follow?

Options:

A.

Utilize fast-track scheduling for completion of the space as a whole

B.

Create separate permits for each area to be completed independently

C.

Designate one portion of the space to be completed prior to another beginning

Buy Now
Questions 31

What is the MINIMUM aisle width in retail areas conforming to universal accessibility standards?

Options:

A.

32" [813 mm]

B.

36" [914 mm]

C.

42" [1067 mm]

D.

48" [1219 mm]

Buy Now
Questions 32

A contractor has notified the designer that the existing paint in a space tests positive for lead. What is the correct course of action?

Options:

A.

The lead paint should be encapsulated with oil-based paint

B.

The designer should notify the Environmental Protection Agency (EPA)

C.

A professional licensed contractor should perform lead-paint abatement

D.

A custodian should vacuum with a high-efficiency particulate air (HEPA) filter vacuum

Buy Now
Questions 33

Several employees in an office suffer from pollen allergies. How could their symptoms be reduced while at work?

Options:

A.

Install non-operable windows

B.

Install high-efficiency air filters

C.

Utilize a passive ventilation system

D.

Relocate these employees to internal offices

Buy Now
Questions 34

In a project that includes a home renovation and procurement of new furniture, what is the BEST fee structure?

Options:

A.

Hourly fee method and cost-plus method

B.

Square foot method and fixed fee method

C.

Fixed fee method and square foot method

D.

Value-oriented method and hourly fee method

Buy Now
Questions 35

What is the rentable square footage [m²] of a building?

Options:

A.

the tenant suite not including any common and shared areas of a building

B.

the tenant suite including all of common areas of a building such as lobbies, corridors, hallways and restrooms (washrooms)

C.

the tenant suite including a percentage of common areas of a building such as lobbies, corridors, vertical penetrations, hallways and restrooms (washrooms)

D.

the common and shared areas of a building such as lobbies, corridors, stairwells, meeting rooms, hallways and restrooms (washrooms) used by all building tenants

Buy Now
Questions 36

When reviewing the general contractor’s pay application, the designer should approve the amount for

Options:

A.

Utilities and property taxes

B.

Subcontractors’ travel expenses

C.

Delivered materials stored on-site

Buy Now
Questions 37

What is the PRIMARY function of an order acknowledgement?

Options:

A.

Secure written agreement before proceeding with the work

B.

Allow review and correction before an order is manufactured

C.

Prescribe the processes for tracking invoices and accounts receivable

D.

Establish the discount structure to be used for purchases related to a particular project

Buy Now
Questions 38

During construction of a project in another city, what is a common and efficient way for a small firm to manage the progress?

Options:

A.

visit the location of the project on a weekly basis

B.

joint-venture with a design firm local to the project

C.

partner with a prominent company local to the designer

D.

hire one employee that will remain in the city of the project

Buy Now
Questions 39

On a small project with an unclear scope involving multiple stakeholders, which fee method would be BEST utilized by the designer?

Options:

A.

hourly

B.

fixed-fee

C.

cost-plus

D.

square footage

Buy Now
Questions 40

During which phase is it BEST to consider integrating a security system in a project?

Options:

A.

permit review

B.

post-occupancy

C.

schematic design

D.

construction documents

Buy Now
Questions 41

What would be included as part of a fire separation (fire assembly)?

Options:

A.

Dampers

B.

Operable window

C.

Low flame-spread rating

D.

Flame retardant wallcovering

Buy Now
Questions 42

Contract documents serve as the legal contract between

Options:

A.

the client and the designer

B.

the client and the contractor

C.

the designer and the contractor

D.

the contractor and the suppliers

Buy Now
Questions 43

When developing a design, which BEST unifies the project and provides specific direction for the design?

Options:

A.

Feasibility studies

B.

Concept statement

C.

Space allocation studies

D.

Programming and research

Buy Now
Questions 44

Which of the following is part of an active system for fire protection?

Options:

A.

Area of refuge

B.

Means of egress

C.

Protected stairwells

D.

Pre-action sprinklers

Buy Now
Questions 45

A designer has been hired to design millwork for a school library. During installation, there is a conflict between existing field conditions and shop drawing dimensions. Who is responsible for the discrepancy?

Options:

A.

Installer

B.

Manufacturer

C.

Interior designer

D.

General contractor

Buy Now
Questions 46

What provision should a designer include in the contract to minimize liability in claims that arise from delays caused by other project members?

Options:

A.

An exclusion of liability for delays caused by other project members

B.

A realistic project schedule with deadlines for each phase of the project

C.

A specified number of months the contract is in force, with a renewal clause

D.

Language excluding the designer from delay-related errors and omissions liability

Buy Now
Questions 47

Which party is responsible for requesting inspections during construction of a project?

Options:

A.

owner

B.

designer

C.

sub-contractor

D.

general contractor

Buy Now
Questions 48

Prior to the contract document phase, a designer should meet with a client for what purpose?

Options:

A.

Having the client understand and approve the finalized drawing layout

B.

Determining what the client’s overall budget is for non-fixed furnishings

C.

Reviewing and giving the client the written proposals for all items to be purchased

D.

Submitting copies of the furniture specifications the designer will be sending to vendors

Buy Now
Questions 49

What should a designer recommend to BEST save on construction costs in a corporate office project with a tight improvement allowance?

Options:

A.

Reuse the existing doors and millwork where possible

B.

Save as many existing nonstructural walls as possible

C.

Maintain the existing water closet and lavatory locations

D.

Design an open-plan for each space without suspended ceilings

Buy Now
Questions 50

What is the MOST effective construction method to help mitigate impact noise from high heels on ahard floor surface?

Options:

A.

Higher NRC in the ceiling material

B.

Framed-in upholstered wall panel system

C.

Resilient underlayment in the floor assembly

D.

Blanket insulation between joists and trusses

Buy Now
Questions 51

A project is considered substantial and complete when

Options:

A.

Partial occupancy has been issued

B.

Deficiencies have been documented

C.

Progress payments have been administered

D.

The owner can use it for its intended purpose

Buy Now
Questions 52

A design firm located in Utah has been awarded a new construction project located in Toronto. What building code and permit requirements must the design firm comply with when designing the project?

Options:

A.

International Building Code

B.

National Building Code of Canada

C.

The applicable building code in the firm’s local jurisdiction

D.

The applicable building code in the project’s local jurisdiction

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 6, 2025
Questions: 175
IDPX pdf

IDPX PDF

$25.5  $84.99
IDPX Engine

IDPX Testing Engine

$30  $99.99
IDPX PDF + Engine

IDPX PDF + Testing Engine

$40.5  $134.99