An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.
Using only the Sizer BOM, which two actions can be performed? (Choose two)
A prospects storage administrator is concerned about deploying Nutanix for their vSphere server virtualization environment due to anticipated increase to the data retention for compliance purpose and associated costs.
Which Nutanix feature should an SE discuss to convince the prospect to move forward?
A prospect is planning to refresh hundreds of remote locations. Each location has the following configuration:
• 2x HPE DL360 servers running vSphere, each using its own local storage
• 3-4 Windows VMs with no plans to expand
Scheduling the initial meeting to discuss the opportunity has been challenging as the prospect believes a Nutanix solution would be overpriced for their remote site needs.
What are two Nutanix capabilities the SE should highlight to address solution cost concerns? (Choose two.)
An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.
Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?
During an initial meeting with a prospect the storage administrator learns that Nutanix does not use RAID for application data. The prospect's storage array is configured with RAID 10 and the full capacity of the array is required. As a result no hot spares have been allocated. The storage administrator must respond immediately to any disk failures, even outside standard business hours.
Which aspect of Nutanix replication factor (RF) will reduce the storage administrator's break/fix burden?
Refer to the exhibit.
Based on the Sizing scenario, what level of resiliency can be inferred about the configuration?
AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three
solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC? (Choose two)
A prospect indicates a requirement to replicate data offsite for a production workload.
Which three questions the SE ask about the prospect's requirement?
(Choose three.)
A prospect facing an upcoming Vmware ELA renewal has a management directive to move to the public cloud due to perceived cost savings. Their virtualization team is currently struggling with refactoring applications for AWS. As a result, the virtualization team is pushing to evaluate VXRail and renew their VMware ELA.
Which two aspects of Nutanix shoud the SE Highlight? (Choose two)
Nutanix SE Academy | NCSE-Level-1 Questions Answers | NCSE-Level-1 Test Prep | Nutanix Certified Systems Engineer (NCSE): Level 1 Questions PDF | NCSE-Level-1 Online Exam | NCSE-Level-1 Practice Test | NCSE-Level-1 PDF | NCSE-Level-1 Test Questions | NCSE-Level-1 Study Material | NCSE-Level-1 Exam Preparation | NCSE-Level-1 Valid Dumps | NCSE-Level-1 Real Questions | Nutanix SE Academy NCSE-Level-1 Exam Questions