Black Friday Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) Questions and Answers

Questions 4

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction

ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Buy Now
Questions 5

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

Options:

A.

Implement an alternative transportation program and conduct a transportation survey

B.

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.

Implement an alternative transportation program and estimate the alternative transportation rate

Buy Now
Questions 6

In order to determine the transportation patterns of occupants of a typical office building, a survey requesting data from what period of time should be administered to meet the requirements of the Location and Transportation Credit, Alternative Transportation?

Options:

A.

Three days

B.

Five days

C.

10 days

D.

14 days

Buy Now
Questions 7

Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?

Options:

A.

Retain a LEED AP

B.

Perform a full life-cycle assessment

C.

Bring the project team together in the performance phase

D.

Take an integrative approach

Buy Now
Questions 8

Rainwater harvesting can be used for which of the following credits or prerequisites?

Options:

A.

Water Efficiency Credit, Water Metering

B.

Water Efficiency Credit, Indoor Water Use Reduction

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

Water Efficiency Prerequisite, Building-Level Water Metering

Buy Now
Questions 9

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Buy Now
Questions 10

The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?

Options:

A.

Table of lighting controls installed

B.

Manufacturers' data for occupancy sensors

C.

The total area of the building square footage

D.

A photometric chart of the multi-occupant space

Buy Now
Questions 11

Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?

Options:

A.

Use of motorcycles

B.

Use of hybrid vehicles

C.

Compressed workweeks

D.

Use of Liquified Petroleum Gas (LPG) vehicles

Buy Now
Questions 12

One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant must

Options:

A.

estimate the purchases of the other tenants and assume they are compliant in the Materials and Resources credit calculations

B.

estimate the purchases of the other tenants and assume they are noncompliant in the Materials and Resources credit calculations

C.

estimate the purchases of the other tenants and apply the compliance rate from LEED applicant in the Materials and Resources credit calculations

D.

exclude the purchases of the other tenants from the Materials and Resources credit calculations

Buy Now
Questions 13

What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

Cost of compliant furniture

B.

Weight of compliant furniture

C.

Cost of both compliant and non-compliant furniture

D.

Weight of compliant and non-compliant furniture

Buy Now
Questions 14

The compliant value of green cleaning products and materials is calculated using what factor?

Options:

A.

Cost

B.

Weight

C.

Volume

D.

Recycled content

Buy Now
Questions 15

What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?

Options:

A.

Botulism

B.

Mold growth

C.

Iron poisoning

D.

Legionella outbreak

Buy Now
Questions 16

Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?

Options:

A.

50

B.

70

C.

76

D.

85

Buy Now
Questions 17

A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection

Guidance, which rating system would be most applicable for this project?

Options:

A.

LEED Interior Design and Construction: Retail

B.

LEED Operations and Maintenance: Retail

C.

LEED Building Design and Construction: Data Centers

D.

LEED Interior Design and Construction: Commercial Interiors

Buy Now
Questions 18

A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they

Options:

A.

are rapidly renewable

B.

have no mercury content

C.

are adaptable to all existing fixtures have lower up front costs than fluorescent lamps

Buy Now
Questions 19

A management method that could be included in a project's site management policy is the use of

Options:

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Buy Now
Questions 20

Which of the following people are required to be listed on the LEED project registration page?

Options:

A.

Owner

B.

LEED AP

C.

Primary Architect

D.

Commissioning (Cx) agent

Buy Now
Questions 21

At what point is it appropriate for the LEED AP to administer an alternative transportation survey to those that visit the building?

Options:

A.

When 50% of visitors utilize alternative transportation modes to visit the building

B.

When 80% of visitors utilize alternative transportation modes to visit the building

C.

When the daily average or typical peak number of visitors is at least 50% of the regular building occupants

D.

When the daily average or typical peak number of visitors is greater than the number of regular buildingoccupants

Buy Now
Questions 22

For the Optimize Energy Performance Credit, ENERGY STAR® eligible buildings may earn

Options:

A.

1-20 points, depending on the ENERGY STAR® rating

B.

3-20 points, depending on the ENERGY STAR® rating

C.

1-20 points, depending on the degree of improvement over the national average

D.

3-20 points, depending on the degree of improvement over the national average

Buy Now
Questions 23

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

Options:

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Buy Now
Questions 24

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

Options:

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Buy Now
Questions 25

A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?

Options:

A.

Provide free coffee and snacks along with the survey

B.

Provide free transit passes for the week before the survey

C.

Pay each survey respondent a cash incentive to encourage them to take public transportation

D.

Email all building occupants asking them to use alternative transportation the week of the LEED survey

Buy Now
Questions 26

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

Options:

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Buy Now
Questions 27

The Materials and Resources (MR) section includes which of the following building products in Credit calculations?

Options:

A.

Furniture

B.

Light Fixtures

C.

Plumbing Fixtures

D.

Mechanical Equipment

Buy Now
Questions 28

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

Options:

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

Buy Now
Questions 29

For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is

Options:

A.

80 picograms per lumen hour for 90% of lamps

B.

90 picograms per lumen hour for 90% of lamps

C.

70 picograms per lumen hour for all mercury-containing lamps

D.

80 picograms per lumen hour for all mercury-containing lamps

Buy Now
Questions 30

What is the maximum distance food or beverage raw materials can be harvested and produced in order to achieve the Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.

60 mi. (97 km)

B.

75 mi.(120 km)

C.

85 mi. (137 km)

D.

100 mi.(160 km)

Buy Now
Questions 31

What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.

Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

40%

B.

50%

C.

60%

D.

70%

Buy Now
Questions 32

How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?

Options:

A.

Local energy supplier estimates or calibrated energy simulation

B.

Historical energy consumption data or calibrated energy simulation

C.

Historical energy consumption data or national average source energy data

D.

Short-term system measurements using data loggers or national average source energy data

Buy Now
Questions 33

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

Options:

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement

Buy Now
Questions 34

Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?

Options:

A.

Install VOC sensors

B.

Document all emissions

C.

Use products with low emissions

D.

Comply with ASHRAE 55-2010

Buy Now
Questions 35

What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?

Options:

A.

Rated life

B.

Light trespass

C.

Power demand

D.

Luminary equivalency

Buy Now
Questions 36

In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)

as determined by ASHRAE 52.2-2007 required for renovation activities?

Options:

A.

7

B.

8

C.

12

D.

13

Buy Now
Questions 37

Which of the following is the most appropriate use of untreated stormwater?

Options:

A.

Irrigation

B.

Boiler water makeup

C.

Drinking fountain

D.

Cooling water makeup

Buy Now
Questions 38

Which of the following topics needs to be addressed by retail project teams when administering the supply chain survey in order to meet the requirements of Materials and Resources, Ongoing Purchasing and Waste Policy, Option 1?

Options:

A.

Resources for additional information

B.

Materials recovery during manufacturing

C.

Waste reduction and waste management measures

D.

Environmental best practices for supply chain decisions

Buy Now
Questions 39

Evapotranspiration data is applied to what credit?

Options:

A.

Water Efficiency Credit, Cooling Tower Water

B.

Water Efficiency Credit, Outdoor Water Use Reduction

C.

Location and Transportation Credit, Alternative Transportation

D.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Buy Now
Questions 40

Which of the following strategies improves cooling tower water efficiency?

Options:

A.

Increase cooling tower fan speed

B.

Increase the cooling tower blowdown

C.

Install and maintain a conductivity meter

D.

Lower set point of water leaving cooling tower

Buy Now
Questions 41

A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be

submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -

Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?

Options:

A.

Cx program overview, project team members, and process activities

B.

Energy Use Breakdown, project team members, and Capital Improvements Measures

C.

Low and No Cost Improvements, Energy Use Breakdown, and Capital Improvements Measures

D.

Cx process activities, Water efficiency optimization strategies, and Energy Use Breakdown

Buy Now
Questions 42

What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?

Options:

A.

One point

B.

Two points

C.

Three points

D.

Four points

Buy Now
Questions 43

Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?

Options:

A.

Meet at least 10% of total energy with on-site renewable energy

B.

Reduce outdoor water use by 60%

C.

Document an alternative transport

D.

Obtain a response rate for the occupant comfort survey of 100%

Buy Now
Questions 44

How many months of metered energy use after occupancy are required to earn Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Three months

B.

Five months

C.

12 months

D.

13 months

Buy Now
Questions 45

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of

the following statements is correct when considering baseline water usage in relation to water use?

Options:

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Buy Now
Questions 46

What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

Options:

A.

Reduce lawn areas

B.

Increase habitat diversity

C.

Increase green space for occupants

D.

Improve water quality of runoff from rainwater

Buy Now
Questions 47

Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?

Options:

A.

When the number of visitors reaches 10% the number of regular building occupants

B.

During the transportation survey period all visitors need to be invited to participate in the survey

C.

Every day no matter the number of visitors in relation to the number of regular building occupants

D.

When either the typical peak or daily average is greater than the number of regular building occupants

Buy Now
Questions 48

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Buy Now
Questions 49

When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

Options:

A.

Distribute the total number of surveys across all tenants evenly

B.

Distribute the total number of surveys across all tenants proportionately, according to their populations

C.

Distribute the total number of surveys across all tenants proportionately, according to their gross floor area

D.

Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Buy Now
Exam Code: LEED-AP-O+M
Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
Last Update: Nov 24, 2024
Questions: 166
LEED-AP-O+M pdf

LEED-AP-O+M PDF

$25.5  $84.99
LEED-AP-O+M Engine

LEED-AP-O+M Testing Engine

$30  $99.99
LEED-AP-O+M PDF + Engine

LEED-AP-O+M PDF + Testing Engine

$40.5  $134.99