A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?
What reference standard is used to determine compliance with Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance when the whole building energy modeling option is used?
A LEED tot Neighborhood Development project team may need to contact or use reference materials from the U.S. Environmental Protection Agency of local equivalency outside the US. Regarding.
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?
Aneighborhood project pursuing LEED for Neighborhood Development certification has 10 existing single family homes and is planning to construct 25 new single family homes Which of the following is Hue in order for the project to comply with GIBc Minimum Building Energy Performance?
A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full-time jobs.
To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?
A)
B)
C)
D)
What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?
Project plans call for60 detached single-family homes. 120attached three-story townhomes,and an apartment budding with 100 dwelling units in five stones.Which choice below satisfies the requirements of Neighborhood Pattern and Development Credit Visitability and Universal Design?
Winch of the following minor improvements withina required buffer zone may be undertaken to enhance appreciation for a wetland or body of water, provided such facilities are open to public access?
A brand new communityis being constructed on a greenfield site. In order to reduce energy consumption, a district heating and cooling system will be built Which or thefollowing may be excluded from the system to achieve Green Intra structure and Buildings Credit. District Heating and Cooling?
A project site would automatically comply with Smart Location and Linkage Prerequisite. Wetland and Water Body Conservation if the project site is
A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?
To meet the requirement of Smart Location and Linkage Credit. Access to Quality Transit, on a
600-ace 1243 hectares) site with 3,500 dwelling units, what Is the minimum number of units that must be within 1/4 mi. (400 m) walk distance of an existing streetcar stop?
According to Green Infrastructure and Buildings Prerequisite. Indoor Waler Use Reduction, the indoor water usage of a new building or buildings undergoing major renovations (nonresidential buildings, mixed-use buildings, and multifamily tour stones or more), must average at least
A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?
Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?
A project is pursuing Neighborhood Pattern and Design Credit. Local Food Production Restrictions in deeds or covenants, conditions, and restrictions (CC&Rs) may prohibit greenhouses in which location?
A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?
The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?
A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?
Winch of thefollowing rating method can beused to determine the performance of luminaires for Green Infrastructure and Buildings Credit. Light Pollution Reduction?
A project site is located in a Federal Empowerment Zone What Is also needed to qualify the protect tor Smart Location and Linkage Credit. Preferred Locations Option 3: Designated High-Priority Locations?
As defined by the Minimum Program Requirements, theLEED project boundary includes the
Which strategycontributes to earning points for the Green Infrastructure and Buildings Credit, Indoor Water Use Reduction?
A project builds a central plant that burns biomass products to provide space heating and hot water to the development. Which ofthe following Green Infrastructure and Buildings credits could this help the project achieve?