Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

LEED-AP-ND LEED AP Neighborhood Development (LEED ND) Questions and Answers

Questions 4

A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

Options:

A.

One year

B.

Two years

C.

Three years

D.

Four years

Buy Now
Questions 5

What reference standard is used to determine compliance with Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance when the whole building energy modeling option is used?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

Buy Now
Questions 6

A LEED tot Neighborhood Development project team may need to contact or use reference materials from the U.S. Environmental Protection Agency of local equivalency outside the US. Regarding.

Options:

A.

floodplain standards

B.

brownfield locations and designations.

C.

designations of uniqueor prime soil types

D.

locating a community supported agricultureprogram

Buy Now
Questions 7

A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?

Options:

A.

One

B.

Two

C.

Three

D.

Five

Buy Now
Questions 8

Aneighborhood project pursuing LEED for Neighborhood Development certification has 10 existing single family homes and is planning to construct 25 new single family homes Which of the following is Hue in order for the project to comply with GIBc Minimum Building Energy Performance?

Options:

A.

GlBc Minimum Building Energy Performance does not apply to single family homes

B.

90% of all 25 new homes must show a 2% improvement over ANSI/ASH RABIESNA Standard 00.1-2010

C.

90% of all 35 new and existing homes must show a 5% improvement over ANSI/ASHRAE/IESNA Standard 90 1 -2010

D.

90% of Jill now homes must meet the requirements of LEED for Homos v4 Minimum Energy Performance prerequisite

Buy Now
Questions 9

A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full-time jobs.

To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 10

What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?

Options:

A.

Rainwater reuse rate

B.

Cost of installing wastewater system

C.

Average amount of annual wastewater generated

D.

Ability to connect to existing wastewater infrastructure

Buy Now
Questions 11

Project plans call for60 detached single-family homes. 120attached three-story townhomes,and an apartment budding with 100 dwelling units in five stones.Which choice below satisfies the requirements of Neighborhood Pattern and Development Credit Visitability and Universal Design?

Options:

A.

Any combination of 56 homes designed forVisitabilityand universal design

B.

Six detached homes designed for universal design. 12 townhomes designed for universal design. 10 apartments designed forVisitability

C.

Zero detached homes designed forVisitability. 12 townhomes designed forVisitability. 10 apartments designed with universal design features

D.

Twelve detached homes designed forVisitability.24 townhomes designed torVisitability. 20 apartments designed with universal design features.

Buy Now
Questions 12

Winch of the following minor improvements withina required buffer zone may be undertaken to enhance appreciation for a wetland or body of water, provided such facilities are open to public access?

Options:

A.

Build one single-story structure not exceeding 1.000 ft2 (93 m2) per 300 linear feet of Outer, on average

B.

Remove hazardous trees, up to 100% of dead trees, and trees less than eight in. (20 cm) in diameter at breast height

C.

Add bicycle and pedestrian pathways that are no more than 12 ft. (3.5 m) wide and where no more than 8 ft. (2.5 m) of their width may be impervious

D.

Create new clearings, not exceeding 1.000 ft2 (95 m2) each, for tables, benches and access for recreational watercraft

Buy Now
Questions 13

Which of the following can be considered a previously undeveloped slle?

Options:

A.

An area of 10 acres (4 hectares), with a previously developed building footprint totaling 8 acres (3 hectares)

B.

An area of 8 acres (0.61 hectare), with a previously developed building footprint totaling 4 acres (2 hectares)

C.

An area of 0.8 acre (0.32 hectare), with a previously developed building footprint totaling 0.2 acre (0 .08 hectare)

D.

An area of 0.5 acre (0.20 hectare) that is an improved park with manicured landscaping and paved playground areas

Buy Now
Questions 14

A brand new communityis being constructed on a greenfield site. In order to reduce energy consumption, a district heating and cooling system will be built Which or thefollowing may be excluded from the system to achieve Green Intra structure and Buildings Credit. District Heating and Cooling?

Options:

A.

Schools

B.

Hospitals

C.

Multi-family buildings

D.

Single-family residences

Buy Now
Questions 15

A project site would automatically comply with Smart Location and Linkage Prerequisite. Wetland and Water Body Conservation if the project site is

Options:

A.

An infill site

B.

An adjacent site

C.

A brownfield redevelopment.

D.

On previously distributed land

Buy Now
Questions 16

A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?

Options:

A.

Light Pollution Reduction

B.

Renewable Energy Production

C.

infrastructure Energy Efficiency

D.

Optimize Building Energy Performance

Buy Now
Questions 17

To meet the requirement of Smart Location and Linkage Credit. Access to Quality Transit, on a

600-ace 1243 hectares) site with 3,500 dwelling units, what Is the minimum number of units that must be within 1/4 mi. (400 m) walk distance of an existing streetcar stop?

Options:

A.

350 unite

B.

1,050 units

C.

1,400 units

D.

1,750 units

Buy Now
Questions 18

According to Green Infrastructure and Buildings Prerequisite. Indoor Waler Use Reduction, the indoor water usage of a new building or buildings undergoing major renovations (nonresidential buildings, mixed-use buildings, and multifamily tour stones or more), must average at least

Options:

A.

10% less than in baseline buildings.

B.

20% less thanin baseline buildings.

C.

30% loss than in baseline buildings

D.

50% less than in baseline buildings.

Buy Now
Questions 19

A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?

Options:

A.

Green Infrastructure and Buildings Credit. Heat Island Reduction

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Green Infrastructure and Buildings Credit. District Heating and Cooling

D.

Green Infrastructure and Buildings Credit. Infrastructure Energy Efficiency

Buy Now
Questions 20

Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.

Passive solar heating strategies offsetting heating energy use

B.

Cogeneration of electricity and heat using mill residue biomass

C.

Geothermal energy used in conjunction with a ground-source Moat pump

D.

Photovoltaic energy generation purchased from an off-site location

Buy Now
Questions 21

A project is pursuing Neighborhood Pattern and Design Credit. Local Food Production Restrictions in deeds or covenants, conditions, and restrictions (CC&Rs) may prohibit greenhouses in which location?

Options:

A.

Rooftops

B.

Back yards

C.

Side yard facing the circulation network

D.

Front yards facing the circulation network

Buy Now
Questions 22

A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?

Options:

A.

Green Infrastructure and Buildings. Optimize Building Energy Performance

B.

Green Infrastructure and Buildings. Outdoor Water Use Reduction

C.

Green Infrastructure and Buildings Heal Island Reduction

D.

Green Infrastructure and Buildings. Renewable Energy Production

Buy Now
Questions 23

The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?

Options:

A.

Dedicated rights-of-way for fixed-rail transit service

B.

Entrance and exit ways for vehicular use into and out of parking lots or structures

C.

All motorizednon-motorized and mixed-mode travel ways permanently accessible in thepublic

D.

Spaces dedicated to non-motorized travel for project occupants to use for travel between buildings

Buy Now
Questions 24

A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?

Options:

A.

Green Infrastructure and Buildings Credit. Rainwater Management

B.

Green Infrastructure and Buildings Credit. Wastewater Management

C.

Green Infrastructure and Buildings Credit. Outdoor Water Use Reduction

D.

Green Infrastructure and Buildings Prerequisite. Indoor Water Use Reduction

Buy Now
Questions 25

Which color of paint has a solar reflectance of one?

Options:

A.

Black

B.

White

C.

Gray at 20%

D.

Gray at 75%

Buy Now
Questions 26

Winch of thefollowing rating method can beused to determine the performance of luminaires for Green Infrastructure and Buildings Credit. Light Pollution Reduction?

Options:

A.

edema index

B.

Light emitting diodes

C.

Backlight-uplight-glare

D.

illuminating Engineering Society. Stage A Evaluation

Buy Now
Questions 27

A project site is located in a Federal Empowerment Zone What Is also needed to qualify the protect tor Smart Location and Linkage Credit. Preferred Locations Option 3: Designated High-Priority Locations?

Options:

A.

Provide 10% of total rental units priced up to 60% area median income (AMI)

B.

Locate the project on an adjacent site that is also a previously disturbed site

C.

Locate the project such that 50% of its dwelling units are within a 1/4 ml.(0.4 km) walking distance of at least seven diverse uses

D.

Use no more than 20% of the total development footprint area for off-street surface parking, with no individual surface parking lot larger than two acres (0.8 hectare)

Buy Now
Questions 28

As defined by the Minimum Program Requirements, theLEED project boundary includes the

Options:

A.

aggregate of parcels within the project controlled by the project developer

B.

land and water area that is reviewed for certification

C.

project area minus the nonbuildable square footage associated with the protect

D.

total land area of a protect site bordering previously developed parcels.

Buy Now
Questions 29

Which strategycontributes to earning points for the Green Infrastructure and Buildings Credit, Indoor Water Use Reduction?

Options:

A.

Non-potable water for cooling towers

B.

Dual-flush toilet

C.

Native vegetation

D.

Water submeters

Buy Now
Questions 30

A project builds a central plant that burns biomass products to provide space heating and hot water to the development. Which ofthe following Green Infrastructure and Buildings credits could this help the project achieve?

Options:

A.

Solar Orientation

B.

indoor Water Use Reduction

C.

District Heating and Cooling

D.

Infrastructure Energy Efficiency

Buy Now
Exam Code: LEED-AP-ND
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Sep 18, 2024
Questions: 100
LEED-AP-ND pdf

LEED-AP-ND PDF

$28  $80
LEED-AP-ND Engine

LEED-AP-ND Testing Engine

$33.25  $95
LEED-AP-ND PDF + Engine

LEED-AP-ND PDF + Testing Engine

$45.5  $130