New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

D-PST-DY-23 Dell PowerStore Deploy 2023 Exam Questions and Answers

Questions 4

An administrator must configure a new protection policy for an existing VM with the following parameters.

Rule Name: 2x5x14

Days: M-F

Every: 12 Hours

Retention: 14 Days

Access Type: Snapshot

Policy

Name: Bronze

Snap Rule: 2x5x14

Apply the policy to VM1.

When you have finished continue to the next question.

Options:

Buy Now
Questions 5

A storage admin is setting up a new protection policy with only snapshot rule for a new file system in PowerStore.

The administrator is given the below parameters.

File system name: FS-1 on SMB-NAS Server.

Size: 5TB

New protection policy: Policy-1

Snapshot rule: Snap-Rule only for Tuesdays on Hourly basis with default retention.

Use the simulator to perform the configuration task.

When you have finished continue to the next question.

Options:

Buy Now
Questions 6

Which two statements are true of PowerStore File Migration import? (Choose two.)

Options:

A.

PS arrays are supported with PowerPath.

B.

Both SMB and NFS are supported, but cannot be mixed.

C.

VNX2 arrays are supported with VDM.

D.

Snapshots and snapshot schedules are migrated

E.

The source file system can be a replica.

Buy Now
Questions 7

SIMULATION

An administrator received a request to provision a new test dev volume.

Use the simulator to provision a volume of 50 GB for their application team. Use a category of Other. The volume performance must not impact the production I/O when the system is heavily loaded.

When you have finished continue to the next question.

Options:

Buy Now
Questions 8

What is a step in configuring VLT interconnects of a PowerStore X implementation?

Options:

A.

Enable VLAN1 on VLT ports.

B.

Disable L2 mode on VLT ports.

C.

Enable LLDP neighbors.

D.

Disable VLT port MACs.

Buy Now
Questions 9

A storage administrator with a small budget must deploy a new scalable block-optimized storage solution requiring NVMe-oF without adding a license.

Which PowerStore configuration would meet the requirements?

Options:

A.

500 X with one expansion enclosure

B.

500 X with no expansion enclosure

C.

500 T with no expansion enclosure

D.

500 T with one expansion enclosure

Buy Now
Questions 10

Place the steps in the correct order to configure vCenter server to use PowerStore to support virtual volumes.

Options:

Buy Now
Questions 11

What is the maximum number of supported replication and snapshot rules in a protection policy?

Options:

A.

One snapshot rule and four replication rules

B.

One snapshot rule and one replication rule

C.

Four snapshot rules and one replication rule

D.

Four snapshot rules and four replication rules

Buy Now
Questions 12

When does a Protection Pokey have to be removed from PowerStore storage resource? (Choose two.)

Options:

A.

Before expanding volume capacity

B.

Before moving the volume to a protected volume group

C.

Before refreshing a Storage Resources from a Clone

D.

Before deleting a volume

Buy Now
Questions 13

An administrator is asked to create NVMe-vVol host in PowerStore.

Which requirement must be met to complete the task?

Options:

A.

The host must be using the ESXi operating system

B.

NVMe-vVol must be created on internal hosts

C.

Two appliances must be available to allow NVMe-vVol migration

D.

Switches must support NVMe/TCP protocol

Buy Now
Questions 14

Which are the two asynchronous file-replication configuration requirements? (Choose two.)

Options:

A.

Map the File Mobility Network to Management Network

B.

Configure the File Mobility Network IP address on Management subnet and VLAN

C.

Configure the File Mobility Network IP address on Storage Network subnet and VLAN

D.

Map the File Mobility Network to Storage Network

Buy Now
Questions 15

What are three requirements of asynchronous file replication? (Choose three.)

Options:

A.

Create FC zoning between PowerStore.

B.

Configure Data Storage Network.

C.

Create bond 1 and Tag replication.

D.

Create Remote System.

E.

Configure File Mobility Network.

Buy Now
Questions 16

Which configuration item is optional during the PowerStore ICW?

Options:

A.

Support and CloudlQ

B.

Default Users

C.

Management Network

D.

Fault Tolerance

Buy Now
Questions 17

What happens when the Reprotect and Reverse option is selected as part of Planned Failover?

Options:

A.

The Planned Failover is automatically reversed at a point-in-time.

B.

The Source and Destination PowerStore systems swap roles and replication resumes in the opposite direction.

C.

The direction of the replication is reversed before the Planned Failover initiates.

Buy Now
Exam Code: D-PST-DY-23
Exam Name: Dell PowerStore Deploy 2023 Exam
Last Update: Dec 26, 2024
Questions: 71
D-PST-DY-23 pdf

D-PST-DY-23 PDF

$25.5  $84.99
D-PST-DY-23 Engine

D-PST-DY-23 Testing Engine

$30  $99.99
D-PST-DY-23 PDF + Engine

D-PST-DY-23 PDF + Testing Engine

$40.5  $134.99