New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

CPIM-ECO Execution and Control of Operations Questions and Answers

Questions 4

A customer has complained that paint is peeling off a product recently purchased from a supplier. A team is formed in the supplier plant to solve the problem and follow these steps:

{exhibit 534}

Which of the following methods best describes the problem-solving approach used by the team?

Options:

A.

Pareto analysis

B.

Brainstorming

C.

Five why's

D.

Fishbone analysis

Buy Now
Questions 5

Which item is a role of the six sigma champion?

Options:

A.

Acting as an internal six sigma consultant

B.

Removing barriers the teams eccounter

C.

Providing technical support and mentoring

D.

Identifying possible causes of the problem

Buy Now
Questions 6

In a continuous flow environment, it is necessary to report which of the following data from the shop floor?

Options:

A.

Setups

B.

Material issues

C.

Defects and scrap

D.

Direct labor hours on and off an operation

Buy Now
Questions 7

Optimizing a patient intake area for improved work flow is consistent with which 5S principle?

Options:

A.

Sort

B.

Set in order

C.

Shine

D.

Standardize

Buy Now
Questions 8

What is a goal of Hoshin planning?

Options:

A.

Target the critical few problems and assign resources to remove barriers for improvement

B.

Focus on the operational plan to remove routine issues that reduce product quality

C.

Solve as many problems as possible by using lean management principals and techniques

D.

Focus on the details of the process in order to better understand what capabilities are required

Buy Now
Questions 9

Which of the following statements about the MRP due date for a shop order is true?

Options:

A.

It is the same as operation priority.

B.

It is used in deriving operation priority.

C.

It is established at order release time and frozen until order completion.

D.

It is equal to the due date plus 5 "M" days.

Buy Now
Questions 10

A work center has a balance between the scheduled input and output over the next 4 weeks. One of the three machines in the work center will be out of service for 1 week. Currently, three operators work the first shift, one operator works the second shift, and each has a 40-hour work week. Which of the following actions is best to take to maintain the schedule?

Options:

A.

Move an operator from the first to the second shift.

B.

Schedule 40 hours of overtime.

C.

Subcontract 40 hours of work.

D.

Adjust the input.

Buy Now
Questions 11

A manufacturer is experiencing excessively long setup times and first-piece inspections. Which of the following areas should be examined first?

Options:

A.

Maintenance records

B.

Raw material consistency

C.

Product design

D.

Tooling

Buy Now
Questions 12

Which of the following activities takes place during prototype production and testing?

Options:

A.

Customer acceptance is emphasized.

B.

The complete product is produced in low-volume pilot runs.

C.

Delivery schedules for components and subassemblies are established.

D.

The qualification of suppliers begins.

Buy Now
Questions 13

One of the main benefits of the A3 problem solving method is:

Options:

A.

coaching.

B.

a statistical approach.

C.

a kaizen event.

D.

voice-of-the-customer data.

Buy Now
Questions 14

Structured problem solving provides what essential result to an organization?

Options:

A.

Recognition of problems in the company's competitive position

B.

Resolution of problems of other organizations in like markets or with similar customers

C.

Recognition of problems with the company's management team

D.

Resolution of both strategic and operational problems

Buy Now
Questions 15

Objectives of implementing a work cell include which of the following outcomes?

Options:

A.

Increasing worker satisfaction

B.

Organizing resources by raw material type

C.

Implementing standard work

D.

Sharing common equipment

Buy Now
Exam Code: CPIM-ECO
Exam Name: Execution and Control of Operations
Last Update: Dec 26, 2024
Questions: 105
CPIM-ECO pdf

CPIM-ECO PDF

$25.5  $84.99
CPIM-ECO Engine

CPIM-ECO Testing Engine

$30  $99.99
CPIM-ECO PDF + Engine

CPIM-ECO PDF + Testing Engine

$40.5  $134.99