New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

CLSSGB Certified Lean Six Sigma Green Belt (CLSSGB) Questions and Answers

Questions 4

Conducting a viable Capability Analysis using Attribute Data one must obtain a fairly large sample set to be statistically sound.

Options:

A.

True

B.

False

Buy Now
Questions 5

Lean had its origins in the development and practice of the ___________ Production System.

Options:

A.

Honda

B.

Toyota

C.

Ford

D.

Motorola

Buy Now
Questions 6

An employee of ACME Corporation noticed that every loan application that gets approved is copied four times and is stored in different locations in the company for no apparent reason. This would be an example of __________________.

Options:

A.

Internal Failure Costs

B.

Appraisal Costs

C.

External Failure Costs

D.

Prevention Costs

Buy Now
Questions 7

When it comes to Control one of the most effective means of eliminating defects is to _________________ .

Options:

A.

Train personnel often and thoroughly

B.

Keep a Six Sigma project going on the process at all times

C.

Design defect prevention into the product

D.

Have each process consist of no more than five steps

Buy Now
Questions 8

A process can be defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a _______________ result.

Options:

A.

Revenue total

B.

Month end

C.

Customer desired

D.

Budgeted

Buy Now
Questions 9

Those who are trained to the skill levels of a Black Belt are typically utilized to apply Lean Six Sigma methodologies what percentage of their time?

Options:

A.

25%

B.

50%

C.

75%

D.

100%

Buy Now
Questions 10

The Purchase Orders for Glenn Manufacturing Company were being copied by an employee and sent to four different departments yet only one department took an action based on the information in the PO. This is an example of ____________.

Options:

A.

External Failure Costs

B.

Appraisal Costs

C.

Internal Failure Costs

D.

Prevention Costs

Buy Now
Questions 11

Due to excessive pollution, GREEN Solutions Inc. is considering subsidizing public transportation to work for its employees. According to the manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work while they use their personal vehicles for their office commute while the management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. Assuming a Normal Distribution for the commute times by either personal or public transportation, which of these is true?

Options:

A.

The probability that they would arrive on time using personal vehicles is much higher than using the metro public transportation system (MPTS)

B.

The probability that they would arrive on time using the MPTS is much higher than using their personal vehicles

C.

The two probabilities are about the same excepting in one case the consistency is higher than the other

D.

We need to compile more data around weekends to incorporate for traffic differences

E.

When Standard Deviation is higher the probability goes down and so the MPTS is worse

Buy Now
Questions 12

After reviewing the Capability Analysis shown here select the statement(s) that are untrue.

Options:

A.

The process is properly assumed to be a Normal process

B.

The Mean of the process moving range is 1.78

C.

The process is out of Control

D.

This Capability Analysis used subgroups

E.

Majority of the dimensional values are outside of the tolerance than within

Buy Now
Questions 13

Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

Options:

A.

True

B.

False

Buy Now
Questions 14

Lean had its origins in the development and practice of the ___________ Production System.

Options:

A.

Honda

B.

Toyota

C.

Ford

D.

Motorola

Buy Now
Questions 15

The Mann-Whitney Test is used to test if the Means for two samples are different.

Options:

A.

True

B.

False

Buy Now
Questions 16

While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?

Options:

A.

Straighten

B.

Sort

C.

Shine

D.

Sustain

Buy Now
Questions 17

The Mann-Whitney Test is used to test if the Means for two samples are different.

Options:

A.

True

B.

False

Buy Now
Questions 18

This output is what type of advanced Capability Analysis?

Options:

A.

Continuous

B.

Binomial

C.

Poisson

D.

Discreet

E.

DPU

Buy Now
Questions 19

Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.

Options:

A.

Much is known

B.

Little is known

C.

We don’t care

D.

Data exists

Buy Now
Questions 20

The Alpha level of a test (level of significance) represents the yardstick against which P-values are measured and the Null Hypothesis is rejected if the P-value is which of these?

Options:

A.

Less than the Alpha level.

B.

Greater than the Alpha level.

C.

Greater than the Beta and Alpha level.

D.

Less than one minus Alpha.

E.

Less than the power of one minus Beta.

Buy Now
Questions 21

Cost of Poor Quality (COPQ) can be classified as Tangible (Visible) Costs and Hidden Costs.

Options:

A.

True

B.

False

Buy Now
Questions 22

In order to standardize project savings financial calculation such project benefits can be compared the financial savings are typically calculated over what period of time?

Options:

A.

12 months

B.

24 months

C.

The remainder of the calendar year

D.

The remainder of the fiscal year

Buy Now
Questions 23

When a Belt is analyzing sample data she should keep in mind that 95% of Normally Distributed data is within +/- 2 Standard Deviations from the Mean.

Options:

A.

True

B.

False

Buy Now
Questions 24

A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X's plotted against a continuous Y is known as a ________________________Chart.

Options:

A.

SIPOC

B.

Multi-Vari

C.

Box Plot

D.

Whisker

Buy Now
Questions 25

For the data shown here a Belt suspects the three grades are supplying the same results. Which statement(s) are true for proper Hypothesis Testing?

Options:

A.

The most appropriate Central Tendency to test is the Means

B.

An appropriate test to test Central Tendency is the Levene’s test

C.

An appropriate test to test Central Tendency is the ANOVA test

D.

An appropriate test to test Central Tendency is the Mood’s Median test

Buy Now
Questions 26

The Central Limit Theorem helps us understand the ___________ we are taking and is the basis for using sampling to estimate population parameters.

Options:

A.

Analysis

B.

Kurtosis

C.

Risk

D.

Route

Buy Now
Questions 27

Lean Six Sigma’s general approach to solving significant challenges related to a process is called _________________.

Options:

A.

DOE

B.

SIPOC

C.

DMAIC

D.

FMEA

Buy Now
Questions 28

The generation of a Regression Equation is justified when we _____________. (Note: There are 4 correct answers).

Options:

A.

Expect the relationship to be Linear between the output and inputs

B.

Know that there is a non-linear relationship between output and input(s)

C.

Need to understand how to control a process output by controlling the input(s)

D.

Experience several process defects and have no other way to fix hem

E.

When it is very expensive or too late to measure the output

Buy Now
Questions 29

What is the Cycle Time, in seconds, for a process having a Throughput of 7,200 units per hour?

Options:

A.

0.5

B.

2

C.

4

D.

10

Buy Now
Questions 30

Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.

Options:

A.

True

B.

False

Buy Now
Exam Code: CLSSGB
Exam Name: Certified Lean Six Sigma Green Belt (CLSSGB)
Last Update: Dec 21, 2024
Questions: 200
CLSSGB pdf

CLSSGB PDF

$25.5  $84.99
CLSSGB Engine

CLSSGB Testing Engine

$30  $99.99
CLSSGB PDF + Engine

CLSSGB PDF + Testing Engine

$40.5  $134.99