New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

C_TS422_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Questions and Answers

Questions 4

What are the key features of using a low level code? Note: There are 2 correct answers to this question.

Options:

A.

To determine the priority of alternative components inside ATP

B.

To determine how costs are rolled up by product costing

C.

To determine the sequence in which materials are planned in MRP

D.

To determine the use of subitems inside material BOM (bill of material)

Buy Now
Questions 5

For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Options:

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

B.

The consistency check must be performed.

C.

The assigned routing bill of material (BOM) must be valid in the entire validity period.

D.

The assigned routing bill of material (BOM) must have the same validity period.

E.

The lot size range must be within the lot size range of the assigned routing.

Buy Now
Questions 6

Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

Options:

A.

Wait time

B.

Float before production

C.

Processing time

D.

Pick time

E.

Setup time

Buy Now
Questions 7

Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.

Options:

A.

To monitor document table changes

B.

To enable integration into a sales order

C.

To save multiple changes for an object

D.

To monitor document object changes

Buy Now
Questions 8

What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

Options:

A.

MRP creates a dependent requirement.

B.

A sales order is delivered.

C.

MRP creates a planned order.

D.

A sales order is created.

Buy Now
Questions 9

What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

Options:

A.

Activating the reporting point backflush in the order dependent parameters

B.

Activating the reporting point backflush in the work centers

C.

Defining the relevant work centers in the routing

D.

Defining the operations as reporting points using the control key

Buy Now
Questions 10

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

Options:

A.

Execute an infinite production planning run for the critical resources.

B.

Reduce the planning time interval.

C.

Determine a time period with available capacity on the planning board.

D.

Increase the capacity supply in a timephased interval.

E.

Form optimum sequences to reduce setup times.

Buy Now
Questions 11

Your project uses process orders for the production of liquid chemicals.

What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

Options:

A.

Resource hierarchy

B.

Resource selection

C.

Resource matrix

D.

Resource network

Buy Now
Questions 12

Your company produces a finished good based on a forecast expects it to be in stock when customers order it. If customers order more than the forecasted quantity this must NOT have any impact on the production program.

Which planning strategy do you use?

Options:

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Planning without final assembly (50)

D.

Maketostock production (10)

Buy Now
Questions 13

What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.

Options:

A.

Queue time

B.

Teardown time

C.

Move time

D.

Setup time

Buy Now
Questions 14

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

Options:

A.

By capacity planning

B.

By order confirmation

C.

By order release

D.

By mass processing

Buy Now
Questions 15

How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

Options:

A.

Select a special procurement type inside the material master.

B.

Use a special item category in your material BOM (bill of material).

C.

Select a special MRP type inside the material master.

D.

Define the special procurement type inside the material BOM (bill of material).

Buy Now
Questions 16

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

By material type

B.

By plant

C.

By period

D.

By material status

Buy Now
Questions 17

What does a line hierarchy in repetitive manufacturing represent?

Options:

A.

A production line with more than one work center

B.

A production line with an alternative sequence in the routing

C.

A production line with a parallel sequence in the routing

D.

A production line with prioritized alternative work centers

Buy Now
Questions 18

Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.

Options:

A.

Customers can grant access to the dashboard to partners.

B.

Customers can use the dashboard in the dev test production tenants.

C.

It can be accessed by using SAP For Me.

D.

It can be used in all SAP S/4HANA Cloud editions.

Buy Now
Questions 19

What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question.

Options:

A.

Establish an organizational structure technical foundation transformation methodology for clean core.

B.

Integrate clean core practices in the endtoend value process chain.

C.

Establish release management.

D.

Establish regular housekeeping tasks procedures.

E.

Define roles responsibilities as part of a process transformation office.

Buy Now
Questions 20

Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.

Options:

A.

Schedule production orders.

B.

Check material availability.

C.

Select master data.

D.

Define integration with cost accounting.

Buy Now
Questions 21

What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

Options:

A.

The Finite Scheduling indicator is NOT set in the strategy profile.

B.

The work center has several individual capacities.

C.

Alternative work centers are fully occupied.

D.

The Change Planning Direction indicator is set in the strategy profile.

Buy Now
Questions 22

What can you use stard heuristics in Advanced Planning (PP/DS) for?

Options:

A.

To automate material movements in material staging

B.

To set default values in production master data

C.

To solve planning problems for defined objects

D.

To optimize costs times in production plans

Buy Now
Questions 23

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?

Note: There are 2 correct answers to this question.

Options:

A.

Order (pool) chart

B.

Capacity requirements chart

C.

Orders (dispatched) chart

D.

Work center capacities chart

Buy Now
Questions 24

You want to create a production order. What methods can you use?

Note: There are 2 correct answers to this question.

Options:

A.

Convert a purchase requisition

B.

Create without material

C.

Create by order release

D.

Create in Kanban process

Buy Now
Exam Code: C_TS422_2023
Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
Last Update: Dec 27, 2024
Questions: 80
C_TS422_2023 pdf

C_TS422_2023 PDF

$25.5  $84.99
C_TS422_2023 Engine

C_TS422_2023 Testing Engine

$30  $99.99
C_TS422_2023 PDF + Engine

C_TS422_2023 PDF + Testing Engine

$40.5  $134.99