New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

DES-4421 Specialist - Implementation Engineer Questions and Answers

Questions 4

A technician replaces a failed Management Module in an MX7000 chassis group. After the technician leaves the site, the administrator reports that the lead chassis is no longer able to communicate with its members.

How can OME-M be used to confirm the cabling configuration?

Options:

A.

View the health status of the lead Chassis Management Module

B.

View the health status of the lead Chassis Management ports

C.

View the I/O module topology map from the lead chassis

D.

View the topology map from the Group Lead

Buy Now
Questions 5

Which controller option the mapping of an entire MX5016s to multiple compute sleds?

Options:

A.

PERC H730 only

B.

HBA330 only

C.

H745 Jumbo PERC

D.

HBA330 and PERC H730

Buy Now
Questions 6

A new administrator has just taken over an MX7000 Multi-Chassis Management Group and two-racks of PowerEdge servers. The previous administrator no longer works at the company and is not available. No one knows the password for the OME-M interface and the default password is not working.

What must be used to reset the password?

Options:

A.

iDRAC for one of the compute sleds.

B.

Left ear control panel.

C.

RACADM using a serial connection

D.

Management Module jumpers

Buy Now
Questions 7

An MX7000 administrator has been tasked to create a Scalable Fabric Architecture on a 3 chassis setup using Fabric B.

Which IOM configuration is recommended?

Options:

A.

Chassis 1 - Slot B1: MX9116n; Slot B2: MX9116nChassis 2 - Slot B1: MX5108n; Slot B2: MX5108nChassis 3 - Slot B1: MX5108n; Slot B2: MX5108n

B.

Chassis 1 - Slot B1: MX7116n; Slot B2: MX7116nChassis 2 - Slot B1: MX7116n; Slot B2: MX7116nChassis 3 - Slot B1: MX9116n; Slot B2: MX9116n

C.

Chassis 1 - Slot B1: MX9116n; Slot B2: MX7116nChassis 2 - Slot B1: MX7116n; Slot B2: MX9116nChassis 3 - Slot B1: MX7116n; Slot B2: MX7116n

D.

Chassis 1 - Slot B1: MX9116n; Slot B2: MX5108nChassis 2 - Slot B1: MX5108n; Slot B2: MX9116nChassis 3 - Slot B1: MX5108n; Slot B2: MX5108n

Buy Now
Questions 8

A company receives their first MX7000 chassis. They connect all the provided power supply cables into two different PDUs on different power grids for redundancy. Each of the six power supplies is cabled and has green LEDs. One Management Module is present along with all system fans. Grid redundancy is configured as the power redundancy mode. The chassis is fully populated with six compute sleds and one IOM but only two of the six sleds will power on.

What is the possible reason for this issue?

Options:

A.

An additional IOM is required to power on and manage the remaining sleds.

B.

Two Management Modules are required to power on the populated chassis.

C.

Power supply unit redundancy policy was not used.

D.

Mixed high line and low line AC inputs in the same chassis is not supported.

Buy Now

DCS-IE |

Exam Code: DES-4421
Exam Name: Specialist - Implementation Engineer
Last Update: Dec 27, 2024
Questions: 54
DES-4421 pdf

DES-4421 PDF

$25.5  $84.99
DES-4421 Engine

DES-4421 Testing Engine

$30  $99.99
DES-4421 PDF + Engine

DES-4421 PDF + Testing Engine

$40.5  $134.99