Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

D-PEXE-IN-A-00 Dell PowerEdge XE9680 and XE8640 Install Questions and Answers

Questions 4

A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cablemanagement arm (CMA).

What are two items to consider when installing a CMA?

Options:

A.

The CMA can be installed to open on either the left or right side of the server.

B.

Do not route optical cables through the CMA.

C.

A CMA can only be installed with a strain relief bar.

D.

The XE9680 does not support a CMA.

Buy Now
Exam Code: D-PEXE-IN-A-00
Exam Name: Dell PowerEdge XE9680 and XE8640 Install
Last Update: Sep 15, 2024
Questions: 14
D-PEXE-IN-A-00 pdf

D-PEXE-IN-A-00 PDF

$28  $80
D-PEXE-IN-A-00 Engine

D-PEXE-IN-A-00 Testing Engine

$33.25  $95
D-PEXE-IN-A-00 PDF + Engine

D-PEXE-IN-A-00 PDF + Testing Engine

$45.5  $130