Special Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

CT-PT ISTQB Certified Tester - Performance Testing Questions and Answers

Questions 4

Which of the following is a typical performance risk associated with mobile, browser-based, and embedded real-time architectures?

Options:

A.

Slow hard disk speed

B.

Misconfigured host machine

C.

Unexpected loads due to API accessibility

D.

Internet connectivity issues

Buy Now
Questions 5

What is typically the result of oversaturation of system resources during performance testing?

Options:

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Buy Now
Questions 6

Which of the following is a major contributor to unreliable performance projections?

Options:

A.

Redundancy between the test and production environments

B.

Disagreement between the technical and business stakeholders during analysis

C.

Differences in the hardware between the test and production environments

D.

Business stakeholders setting unrealistic performance goals

Buy Now
Questions 7

You are heading the testing effort for a system that manages the air/fuel ratio of direct-injection fuel devices built specifically for high-altitude rescue helicopter engines. At altitude, the system must be able to perform in order to make enough air/fuel ratio adjustments per millisecond between fuel and both an on-board source and available ambient air in order to prevent an engine stall due to oxygen starvation. The system is following a sequential development lifecycle.

For this safety-critical software, when is the appropriate point in the lifecycle to identify and define the performance goals?

Options:

A.

After test readiness has been achieved, but before system testing starts

B.

During the requirements phase when the business stakeholders have the opportunity to agree

C.

At the very beginning of the project during the concept stage

D.

During the software design phase when the requirements are set and the design is being defined

Buy Now
Questions 8

Which of the following is a key reason to include ramp-up and ramp-down periods in a performance test?

Options:

A.

To ensure virtual users complete their transactions within a defined time window

B.

To simulate a more realistic user load pattern and avoid sudden system stress

C.

To provide a buffer for slow-performing transactions to complete

D.

To guarantee that all virtual users remain active throughout the test duration

Buy Now
Questions 9

Which of the following is a typical performance risk associated with distributed architectures?

Options:

A.

A local hard disk that has been de-fragmented

B.

Excess computer memory resources

C.

Unreliable or unpredictable remote servers

D.

Inconsistent Bluetooth connectivity

Buy Now
Questions 10

Which of the following is typically the result of oversaturation of system resources during performance testing?

Options:

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Buy Now
Questions 11

Which of the following is considered a common web service protocol?

Options:

A.

SOAK

B.

REST

C.

HTTP

D.

RTE

Buy Now
Questions 12

Which of the following is the best description of spike testing?

Options:

A.

It focuses on the ability of the system to handle loads that are gradually increased to reach the expected maximum.

B.

It focuses on the ability of the system to handle loads that are at or beyond the expected peak load.

C.

It focuses on the ability of the system to meet future efficiency requirements.

D.

It focuses on the ability of the system to respond to quick and extreme changes in load.

Buy Now
Exam Code: CT-PT
Exam Name: ISTQB Certified Tester - Performance Testing
Last Update: Apr 3, 2025
Questions: 40
CT-PT pdf

CT-PT PDF

$25.5  $84.99
CT-PT Engine

CT-PT Testing Engine

$30  $99.99
CT-PT PDF + Engine

CT-PT PDF + Testing Engine

$40.5  $134.99