Special Summer Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

CFM Certified Facility Manager Questions and Answers

Questions 4

How can you prevent power issues in a training room dependent on Power over Ethernet (PoE) switches?

Options:

A.

Load shedding

B.

Redundant power over Ethernet switches

C.

Uninterruptible power supply

D.

Capacity management

Buy Now
Questions 5

Which statement about fiber optic cable is correct?

Options:

A.

Very low resistance to noise and interference

B.

It has fewer environmental effects than copper wiring or cable

C.

Ability to carry signals for short distances before requiring repeaters than copper cable

Buy Now
Questions 6

What is the BEST way to acknowledge acceptance of completed project deliverables?

Options:

A.

Scope control

B.

Scope definition

C.

Scope verification

D.

Scope planning

Buy Now
Questions 7

How can the building information model (BIM) be used for emergency preparedness?

Options:

A.

It provides first responders with the names of all building occupants.

B.

It is not useful for emergency preparedness.

C.

It creates a virtual environment of the building for emergency personnel.

D.

It can help predict how an emergency will unfold.

Buy Now
Questions 8

You are the Facility Manager for a retail strip mall with strong storefront style standards approved by the local government planning board. A long-term tenant, a Chinese restaurant, wants to construct a tile pagoda-style mansard that does not comply with the lease terms. How should you respond to this tenant’s request?

Options:

A.

The tenant cannot modify the entrance because the new entrance would not conform to the approved master plan of that shopping center, which has been approved by the local governmental planning board.

B.

The tenant must hire an architect to design the modification to the entrance in compliance with the guidelines spelled out in the master real estate plan.

C.

The tenant can modify the entrance, providing they pay for the improvement. This change must comply with the guidelines spelled out in the master real estate plan.

Buy Now
Questions 9

Which bond is returned to contractors who submit unsuccessful proposals?

Options:

A.

Performance

B.

Bid

C.

Retention

Buy Now
Questions 10

What is a good reason to get the facilities engineers involved early in the planning of a new building design or major renovation?

Options:

A.

To create operational and energy usage benchmarks at the beginning of the project

B.

To ensure that the as-built drawings are accurate

C.

To ensure that the design optimizes the operations and maintenance of the proposed building systems

D.

To ensure that all punch list items have been adequately addressed

Buy Now
Questions 11

What is the purpose of a punch-list (defects list) walk-through in construction?

Options:

A.

To identify items that do not conform to contract documents that the contractor must complete prior to final payment

B.

To ensure that the construction site is free from debris

C.

To walk through the construction project with the contractor and discover what needs to be completed

Buy Now
Questions 12

What does CAFM stand for?

Options:

A.

Computerized Assistant Facility Management

B.

Certified Associated Facility Manager

C.

Computer-Aided Facility Management

Buy Now
Questions 13

When is the final payment made for a large-scale construction project?

Options:

A.

At the time of substantial completion

B.

After no less than 100% of the construction work has been completed

C.

Upon receipt of all deliverables, closeout documents, and lien releases

Buy Now
Questions 14

What is the correct order for strategic facility planning?

Options:

A.

Strategic purpose, strategic planning, business unit planning, tactical planning, execution, measurement, feedback

B.

Strategic purpose, business unit planning, strategic planning level, measurement, execution, feedback, tactical planning

C.

Tactical planning, business unit planning, execution, measurement, feedback, strategic planning, strategic purpose

D.

Business unit planning, tactical planning, execution, measurement, feedback, strategic purpose, strategic planning

Buy Now
Questions 15

You work for a company that provides facility management services for a bank. The bank wants your company to demonstrate its commitment to continuous improvement in service delivery. How can you demonstrate to the bank your commitment to continuous improvement?

Options:

A.

Find out what other banks do in terms of continuous improvement.

B.

Write to the bank stating your commitment to continuous improvement.

C.

Include indicators relating to continuous improvement in the service level agreement.

D.

Ask the bank to submit a list of continuous improvement requirements.

Buy Now
Questions 16

When are lockout/tagout procedures complete?

Options:

A.

An employer develops and implements a written energy control program.

B.

The electrical cable is securely placed in a cabinet.

C.

Authorized employees have received the proper training.

D.

Equipment is isolated from its energy source and appropriate records completed.

Buy Now
Questions 17

What functionality enables a Building Automation System (BAS) to support energy management during peak demand periods?

Options:

A.

Thermal coupling

B.

Capacity management

C.

Load shedding

D.

Cycle management

Buy Now
Questions 18

What is the MOST effective tool in managing change?

Options:

A.

Managing resistance.

B.

Anticipating user denial.

C.

Using surveys.

D.

Communication.

Buy Now
Questions 19

What factors are included in the SMART approach to developing key performance indicators?

Options:

A.

Systematic, measurable, achievable, reliable, time-bound.

B.

Specific, measurable, achievable, rational, time-bound.

C.

Specific, measurable, achievable, relevant, time-bound.

D.

Systematic, measurable, achievable, related, time-bound.

Buy Now
Questions 20

The facility manager has been asked to provide a listing of all properties owned and leased by the organization. In which system does the information typically reside?

Options:

A.

Building Information Modeling System.

B.

Computer Aided Facility Management System.

C.

Building Automation System.

D.

Computerized Maintenance Management System.

Buy Now
Questions 21

A facility manager may be responsible for status reviews on projects. Why are status reviews important and valuable?

Options:

A.

To identify reasons for variance from baseline and ensure responsible parties are identified

B.

To keep accurate records of all project tasks regardless of variation from baseline

C.

To identify issues and corrective actions to ensure the project remains on track

D.

To keep the project team aware of others’ progress on a project

Buy Now
Questions 22

What does Environmental Health and Safety focus on?

Options:

A.

People, property, and environment.

B.

Compliance, use, and legal matters.

C.

Worker rights, policies, and practices.

D.

Security, assets, and equipment.

Buy Now
Questions 23

What encourages consumption of products and services with the LEAST environmental impact?

Options:

A.

Materials management.

B.

Product stewardship.

C.

Closed-loop recycling.

D.

Waste management.

Buy Now
Questions 24

Which is the MOST important best practice to ensure a successful safety culture?

Options:

A.

Go beyond statutory requirements.

B.

Lead by example.

C.

Utilize technology to streamline safety training and enforcement.

D.

Prioritize safety.

Buy Now
Questions 25

What is referenced when demonstrating how a facility management project is directly linked to a corporation's long-range plan, outlining its broad, high-level goals?

Options:

A.

Success criteria

B.

Project charter

C.

Strategic facility plan

D.

Real estate master plan

Buy Now
Questions 26

You are the Facility Manager for a retail strip mall with strong storefront style standards approved by the local government planning board. A long-term tenant, a Chinese restaurant, wants to construct a tile pagoda-style mansard that does not comply with the lease terms. How should you respond to this tenant’s request?

Options:

A.

The tenant cannot modify the entrance because the new entrance would not conform to the approved master plan of that shopping center which has been approved by the local governmental planning board.

B.

The tenant must hire an architect to design the modification to the entrance in compliance with the guidelines spelled out in the master real estate plan.

C.

The tenant can modify the entrance providing they pay for the improvement. This change must comply with the guidelines spelled out in the master real estate plan.

Buy Now
Questions 27

What does the effectiveness of infrastructure resilience rely on?

Options:

A.

Finance, security, supply chain, communications.

B.

Robustness, resourcefulness, rapid recovery, redundancy.

C.

Back-up power, capital planning, supply chain, security.

D.

Written incident response plans, training, management participation, employee adaptability.

Buy Now
Questions 28

What is an effective way to engage your staff in generating ideas that support the organization’s goal?

Options:

A.

Consider only those ideas of select staff.

B.

Roll out to the organization those processes which you believe are effective.

C.

Obtain feedback from staff and implement those ideas with positive feedback.

D.

Develop an open-door policy and dialogue with staff on how the team may help the organization achieve its goals.

Buy Now
Questions 29

What, in addition to vision, incentives, action plan, and resources, is required for the change management process to be effective?

Options:

A.

Experience

B.

Support

C.

Directives

D.

Skills

Buy Now
Questions 30

What action should you take to address the premature aging of a roofing membrane?

Options:

A.

Plan and budget for replacing the roof system as soon as possible to prevent degradation or damage to other building components and contents.

B.

File a warranty claim with the manufacturer based on the membrane’s failure to reach its expected service life.

C.

Extend the service life of the roofing membrane with patches and repairs as leaks are detected until the full expected service life of the membrane is realized.

D.

Explain to occupants that water infiltration is expected in any facility and it will be addressed as an ongoing maintenance and repair item.

Buy Now
Questions 31

You have taken a position in a new country and do not speak the native language. However, your first task will be a facility renovation project. You need to become familiar with the standards, regulations, and laws that are applicable to a facility renovation project. What information source would be most accurate?

Options:

A.

The laws for the country’s national government

B.

The local authority having jurisdiction

C.

The owner's corporate legal department

D.

The organization that wrote each law, standard, and regulation

Buy Now
Questions 32

What is the definition of "real property"?

Options:

A.

Things located within buildings such as furniture, accessories, appliances, etc.

B.

Property that has nothing artificial on it, only natural materials.

C.

Land, buildings, and machinery or equipment.

D.

Inventory and loose materials.

Buy Now
Questions 33

What best describes a Building Automation System (BAS)?

Options:

A.

A system supporting two-way communication between controllers and devices, automated decisions, and analysis.

B.

A one-way control mechanism for multiple core building systems.

C.

A system that integrates various facility management functions, including building security and facility space metrics.

D.

A system that does not operate third-party systems.

Buy Now
Questions 34

What is considered the point in an asset’s life cycle where the total ownership costs are at the lowest?

Options:

A.

Ownership life

B.

Useful life

C.

End of life

D.

Economic life

Buy Now
Questions 35

The Facilities Management Department manages several service agreements related to environmental stewardship. When reviewing these service level agreements (SLAs), what should the Facility Manager consider?

Options:

A.

Best practices relevant to environmental stewardship.

B.

How to negotiate the regulatory requirements to meet the customer’s requirements.

C.

How to calculate maintenance and utility costs.

Buy Now
Questions 36

Office standards have been revised to reduce the overall square footage. Certain levels of management will receive more space, but the majority will see a significant reduction. The facility manager is tasked with presenting the information to management. Which is the BEST form of communication to deliver the information?

Options:

A.

A meeting with managers and executives.

B.

A written statement issued from HR with joint signatures.

C.

A meeting with executives.

D.

An email addressed to all managers and executives.

Buy Now
Questions 37

What is the purpose of a punch-list (defects list) walk-through in construction?

Options:

A.

To identify items that do not conform to contract documents that the contractor must complete prior to final payment

B.

To ensure that the construction site is free from debris

C.

To walk through the construction project with the contractor and discover what needs to be completed

Buy Now
Questions 38

There has been a recent increase in complaints of items stolen from people's desks within a facility. What is the facility manager's initial step regarding the security of the staff and facility?

Options:

A.

Install security cameras throughout the facility to ensure you capture future incidents.

B.

Update your security procedures to ensure that staff maintain a secure desk.

C.

Investigate each case and remind staff to ensure all valuables are locked.

D.

Turn the matter over to a professional security company to lead an investigation.

Buy Now
Questions 39

Which key document must a facility manager use when evaluating the Real Estate Master Plan?

Options:

A.

Budget.

B.

Strategic plan.

C.

Leasing analysis.

D.

Capital investment strategy.

Buy Now
Questions 40

What should be considered when developing a strategic facility management plan?

Options:

A.

The demand organization’s business plan.

B.

Reducing facility management cost.

C.

Obtaining a larger facility management budget.

Buy Now
Questions 41

What is a knowledge area of project management according to the Project Management Body of Knowledge (PMBOK) of the Project Management Institute?

Options:

A.

Design management

B.

Scope management

C.

Construction management

D.

Vendor management

Buy Now
Questions 42

What is the greatest benefit to implementing an Integrated Work Management System (IWMS)?

Options:

A.

It will make the board members happy.

B.

The building floor plans will all be in one place.

C.

It will improve customer service.

D.

The building systems will no longer need to be monitored.

Buy Now
Questions 43

During the construction phase of a project you are managing, the customer wishes to add to the project scope. You think that the cost of the change is 25% greater than your contingency. What steps will you take?

Options:

A.

Get an estimate from the contractor for a change order. Also, review the impact this will have on the entire project’s cost, schedule, quality, and risks. Present these findings to the customer along with the request for additional funds.

B.

Tell the customer you may be able to accommodate their request if the contingency budget is not used for other issues. Try to cut other scope items or create savings in other parts of the project to fully fund this request.

C.

Tell the customer that their request is out of scope and cannot be accommodated. The project does not have the funds for this additional work. Explain how this request impacts schedules delaying work and adding significantly to time as well as cost.

D.

Immediately agree to add the work to your project scope without getting an estimate from the contractor to determine the additional cost. You and the contractor can work out the differences as you go along.

Buy Now
Questions 44

A new department manager is not clear on the services provided by the facility management department and is often negative about facility management while at management meetings. How should a facility manager address the customer's expectations?

Options:

A.

Request that the manager refrain from complaints at this meeting as it is not the appropriate venue.

B.

Request that the other managers have a discussion with him about office protocol.

C.

Request that he read his service level agreement.

D.

Review the customer service level agreement to determine a mutually agreed performance standard.

Buy Now
Questions 45

What is an Integrated Workplace Management System (IWMS)?

Options:

A.

An energy-efficient tool to operate HVAC systems.

B.

Requires a BAS system to be in place.

C.

An enterprise-level software platform that facilitates integration of data.

D.

Must be replaced or updated every 5 years to remain viable.

Buy Now
Questions 46

What mechanism should be used to evaluate the work of an outsourced property management contract?

Options:

A.

Create a checklist in the scope of work.

B.

Describe the expected performance of the contract.

C.

Clearly identify Key Performance Indicators.

D.

Research Best Practices for outsourcing.

Buy Now
Questions 47

What is the process of limiting a company's exposure to liability?

Options:

A.

Risk management.

B.

Risk avoidance.

C.

Liability management.

D.

Limited liability analysis.

Buy Now
Questions 48

When are the laws of supply and demand relative to price?

Options:

A.

When demand exceeds supply, prices drop

B.

Price is the only factor that limits the supply

C.

When demand exceeds supply, prices rise

D.

If supply exceeds demand, prices rise

Buy Now
Questions 49

What is the fourth stage in a well-established model of team development that consists of forming, storming, and norming?

Options:

A.

Adjourning

B.

Completing

C.

Reporting

D.

Performing

Buy Now
Questions 50

You work for a facilities management service provider that wants to improve its service delivery processes and has decided to analyze its performance data. What advice would you offer regarding the data analysis exercise?

Options:

A.

Have an independent consultant analyze the data.

B.

Only analyze data that relates to subpar performance.

C.

Only analyze data that is less than twelve months old.

D.

Use the data that is valid and relevant.

Buy Now
Questions 51

You work for an organization that puts a strong emphasis on corporate values and being the employer of choice; truly valuing their people. The organization has put a lot of time and effort into ensuring that policies and procedures are in place to create an environment where employees are valued. This includes the company's performance appraisal system. How do you ensure the employees meet the expectations of the organization as well as your expectations?

Options:

A.

The organization will provide the format for performance reviews, including how often they occur. Set performance measures with employees and review with them according to the organization policy.

B.

Conduct an annual performance review as specified by HR. Have the employees develop a list of goals for themselves, taking into account the organization's objectives for next year.

C.

Develop performance measures and have the employees confirm their goals in writing and send monthly reports on progress towards their goals, including any issues they are facing.

D.

Set performance measures that are specific, measurable, and realistic. Tie these performance measures to department and organizational goals. Conduct monthly coaching sessions to review progress with the employees and provide coaching as needed to keep them on track.

Buy Now
Questions 52

What approach best promotes indoor environmental quality and health?

Options:

A.

The maintenance and monitoring of acceptable levels of ambiance, safety, lighting, and environmental wellness.

B.

The strategies and systems used to provide occupants with a healthy, productive, comfortable, and safe workplace.

C.

The measurement and monitoring of hazardous conditions that pose threats to health, the environment, and the quality of life.

Buy Now
Questions 53

What is the BEST course of action for a facility manager to take when an engineer continues to lag behind other engineers in productivity?

Options:

A.

Use the engineer as an example of how not to perform to other engineers.

B.

Report the engineer to Human Resources.

C.

Develop a performance improvement plan with the engineer.

D.

Give the engineer a chance to correct his deficiencies on his own.

Buy Now
Questions 54

What is one of the MOST common reasons implementing a Computerized Maintenance Management System (CMMS) fails?

Options:

A.

Users are resistant to change.

B.

The board members are not interested in the system.

C.

The CMMS is home-grown.

D.

The building systems are not compatible with the CMMS.

Buy Now
Questions 55

A landlord has just completed a major capital improvement in a multi-tenant commercial building. The property manager is responsible for determining if the costs of the project can be recovered from the tenants. What is NOT part of the process?

Options:

A.

Checking each lease to determine if capital costs are recoverable

B.

Splitting costs evenly and charging all costs in the year when the project was performed

C.

Determining how much should be recovered each year and for how many years

D.

Determining if a finance charge gets added to the recoverable costs

Buy Now
Questions 56

What is one of the most important aspects of an effective change management process?

Options:

A.

Waiting until after the end of the implementation as it is impossible to judge effectiveness until end users get used to it.

B.

Ignoring the pre-change culture as this will inevitably evolve once old attitudes adjust.

C.

Not involving the end users at each step of the process as this can open up to confusion and delays.

D.

Involving the end users at each step of the process to obtain their buy-in and reduce resistance.

Buy Now
Questions 57

The facility manager is managing an office renovation. The entire renovated area is to be re-carpeted with synthetic roll carpet over the weekend. What should be done prior to installation?

Options:

A.

Wrap the carpet in plastic to minimize the release of vapors before the weekend

B.

Send an email to all staff to open all the windows

C.

Ask the dealer to off-gas the carpet off-site

Buy Now
Questions 58

In an indoor office environment, what is the MOST common complaint received by the facilities department?

Options:

A.

Indoor air quality

B.

Heating and cooling

C.

Janitorial issues

D.

Ergonomics issues

Buy Now
Questions 59

What sustainability benefits can be attributed to the use of a fully implemented Geographic Information System (GIS)?

Options:

A.

Greenhouse Gas Reduction and Water Runoff

B.

Greenhouse Gas Reductions and Energy Conservation

C.

Water Runoff and Composting

D.

Water Runoff and Energy Conservation

Buy Now
Questions 60

What is the MOST effective exposure control to prevent occupational hazards and protect workers?

Options:

A.

Elimination, where the hazard is physically eliminated.

B.

Personal protective equipment, where the worker is protected.

C.

Engineering controls, where people are isolated from the hazard.

D.

Administrative controls, which change the way people work.

Buy Now
Questions 61

What is a way for facility managers to promote sustainability in the workspace?

Options:

A.

Shorten the cafeteria hours of operation by two hours daily.

B.

Establish a recycling program and communicate results.

C.

Ensure janitorial staff performs routine inspections.

D.

Offer a physical fitness program.

Buy Now
Questions 62

A new hire has been provided with new uniforms and a $150 stipend to purchase new work boots. Within the first month of employment, the employee informs the manager that another job has been accepted and provides a two-week notice. What actions should the manager take regarding the material issuances?

Options:

A.

Ask in a thoughtful and respectful tone for the employee to reimburse the organization for the uniforms and work boots.

B.

Absorb the loss of the material in the operating budget under uniform depreciation.

C.

Refer to the employee handbook and follow organizational policy regarding uniform and work boot issuances.

Buy Now
Questions 63

What is an approach to serving human needs by using resources productively and sustainably?

Options:

A.

Lifecycle materials management

B.

Waste management

C.

Environmental protocol

D.

Recycling

Buy Now
Questions 64

How should the facility manager ensure the gym meets staff expectations?

Options:

A.

Solicit staff asking for suggestions on how to improve the gym.

B.

Poll in the industry and ask them how best to create and maintain a gym facility for staff use.

C.

Have the facility manager perform the monthly inspections.

D.

Hire a consultant to provide you with information regarding trends to keep a gym current.

Buy Now
Questions 65

What is included in contract documents specified in owner and contractor agreements?

Options:

A.

Bidding requirements

B.

Notice to bidders

C.

Specifications

D.

Shop drawings

Buy Now
Questions 66

When managing quality, what are Key Performance Indicators (KPIs) based on?

Options:

A.

What stakeholders feel is important

B.

What the facility manager feels is important

C.

What the facility management team feels is important

D.

What the CEO feels is important

Buy Now
Questions 67

What is the relationship between position power and personal influence?

Options:

A.

Position power alone is sufficient for effective leadership

B.

Position power can create personal influence

C.

Personal influence cannot be attained without first having a position of power

D.

Personal influence and position power come from different sources

Buy Now
Questions 68

When your company is considering consolidating its real estate portfolio, what are the most critical factors to consider?

Options:

A.

Current space utilization, overall occupancy cost per square foot, geographic proximity/overlap

B.

Lease vs. own status, neighborhood amenities, political environment

C.

Make-up of the workforce, outdated interiors, tax incentives

Buy Now
Questions 69

What is the most important strategic issue in the relationship between facility requirements and organizational requirements?

Options:

A.

Coordination

B.

Alignment

C.

Understanding

Buy Now
Questions 70

A facility manager is on a project team and needs a list of qualified potential contractors. What is the first document that the facility manager should send to the potential contractors?

Options:

A.

Request for pricing information

B.

Request for information

C.

Request for proposal

D.

Letter of intent

Buy Now
Questions 71

When posting required signage for fire emergencies, which message is the MOST immediate?

Options:

A.

Location of First Aid kits

B.

Location of emergency exits

C.

Location of AED with directions for its use

Buy Now
Questions 72

What does a Cost Plus to a Guaranteed Maximum Price (GMP) contract signify?

Options:

A.

The Contractor is selected based on final drawings and his own costs and the individual subcontractors' costs. No cost increases are allowed beyond the GMP.

B.

The Contractor is selected based on GMP price of the final drawings and can charge the project based on all invoices produced plus its Fee & General Conditions costs.

C.

The Contractor is selected early in the project based on its Fee and its General Conditions costs and provides a GMP once drawings are more developed.

Buy Now
Questions 73

What are the three steps in conducting a risk assessment?

Options:

A.

Identification, analysis, and evaluation.

B.

Analysis, consultation, and review.

C.

Consultation, identification, and treatment.

D.

Likelihood, consequence, and rating.

Buy Now
Questions 74

What approach should be taken to accommodate sustainability and customer concerns about installing flow restrictors?

Options:

A.

Take no action. The WPM is guided by company sustainability initiatives and this program needs to be implemented.

B.

Offer to place out the flow restrictors in a few designated restrooms to provide customer feedback on their performance. Agree to review and meet later with the WPM.

C.

Install the flow restrictors and remove them without informing the WPM.

D.

Refuse to install the flow restrictors.

Buy Now
Questions 75

After a disaster, the facility manager must strive for effective and efficient use of response resources. What item should be included in the emergency response plan to simplify this effort?

Options:

A.

Contact information for police, fire, and hospital personnel

B.

A prioritized list of critical facilities and systems

C.

A personnel recall list

Buy Now
Questions 76

What detailed review process results in a score outlining the status, age, and life cycle condition of a building and its components?

Options:

A.

Post-occupancy evaluation.

B.

Facility condition assessment.

C.

Life cycle cost analysis.

Buy Now
Questions 77

A facility manager is responsible for this year's renovation projects. The Vice President has indicated that it is critical to develop and adhere to space and furniture standards while meeting corporate needs within budget. One of the most important projects is the renovation of four floors of a building which will house the Finance and Sales and Marketing Departments. In meeting with the management of each department, a list of needs that they expect in the renovations has been compiled. Some of the needs are easily met within corporate standards, while other needs would require unique solutions. The facility manager has been able to meet most needs of both departments and has also explained to the management of each department why all needs cannot be met.

A week after both departments move, the Vice President calls the facility manager and states employees in Sales and Marketing and Finance have indicated that they are dissatisfied with their space and that the facility manager was not responsive to their needs.

How should the facility manager verify that the groups are dissatisfied and rectify the situation?

Options:

A.

Review all the materials received on the project to verify space was built per the scope of work.

B.

Do a formal review of the project including various staff levels to get an understanding of the complaints and create an action plan to resolve them.

C.

Have some water cooler discussions to gather information about the negative comments and make adjustments accordingly.

D.

Do nothing, move on to the next project, and make an effort to avoid the problem in the future.

Buy Now
Exam Code: CFM
Exam Name: Certified Facility Manager
Last Update: Apr 3, 2025
Questions: 251
CFM pdf

CFM PDF

$25.5  $84.99
CFM Engine

CFM Testing Engine

$30  $99.99
CFM PDF + Engine

CFM PDF + Testing Engine

$40.5  $134.99