Black Friday Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

CCJE Certified CloudBees Jenkins Engineer (CCJE) Questions and Answers

Questions 4

You want to trigger a build when there K an SCM change. Which are reasons you might want to use a post commit trigger instead of polling the SCM frequently?

Choose 2 answers

Options:

A.

Polling can introduce additional delays.

B.

A post-commit trigger build includes all dependencies.

C.

Polling may consume unnecessary resources.

D.

Poling will not check out the latest revision.

E.

A post commit trigger build is more reliable.

Buy Now
Questions 5

Which enables you to use artifacts from a completed build In the workspace of the currently running build?

Options:

A.

Rebufld pkjgin.

B.

ArtifactDeptoyer plugin.

C.

Jenkins core.

D.

Copy Artifact plugin.

Buy Now
Questions 6

When the ‘’Allow automatic upgrades of plugins on restart" option is enabled, what will Beekeeper Upgrade Assistant try to do on every restart?

Options:

A.

Upgrade every plugin in the system to the latest available version.

B.

Upgrade to a new version of CloudBees Core if it is available.

C.

Upgrade every plugin In the CAP Collectionto the version defined by CAP.

D.

Replace every plugin in the system with the version defined by CAP.

Buy Now
Questions 7

You have an Operations Center architecture as pictured in the exhibit above, where there are:

• Three folders: F1, F2, and F3

• Three shared agents: SI, S2, and S3

• Four client masters: Ml, M2, M3, and M4

Which statements are true?

Choose 2 answers

Options:

A.

M1 can only perform builds on S1.

B.

M3 can only perform builds on S2.

C.

M4 can perform builds on any shared agent.

D.

M3 can only perform builds on S2 and S3.

E.

M4 can only perform builds on S3.

Buy Now
Questions 8

Which is the expected workflow for "Test-Driven Development"?

Options:

A.

Write a new fating unit test, write the new functional code to fix the test, verify that the test passes, and then refactor the code.

B.

Write a new test, validate with the CI system, and then write the new functional code.

C.

Validate with the G system, write the new functional code, and then verify that the test passes.

D.

Write a new failing unit test, write the new functional code to fix the test, and then verify that the test passes.

Buy Now
Questions 9

Withthe CloudBees Folders Plus plugin, which step is required to configure a controlled agent?

Options:

A.

The folder administrator sends an email, containing the folder ID, to the agent administrator, who adds the ID to the list of approved folders.

B.

Anyone with admin permissions can simply be the ID of the folder to the specific agent; no other steps are necessary.

C.

The folder administrator sends a request, containing a digital signature, to the agent administrator, who adds the signature to the list of approved signatures.

D.

The folder administrator creates a request key which is given to the agent administrator, who approves the request key and sends back a request secret.

Buy Now
Questions 10

When designing a Jenkins architecture for your organization, two of the most common ways of stratifying development of projects are 1) populating masters by fobs based on the environment they are deploying to, and 2) assigning masters to divisions within an organization, based on an org chart. Which of the following is an advantage of stratifying by environment over stratifying by org chart?

Options:

A.

Outage of a master will not block flows for all products.

B.

You can easily restrict access to a department's protects to the users within that department.

C.

You can tailor the installed plugins to be specific to the needs of the environment.

D.

You can more easily create pipelines covering entire products.

Buy Now
Questions 11

Which is an advantage of using a replaceable build node?

Options:

A.

It allows jobs to have dedicated machines tailored to specialized needs.

B.

It improves the throughput of master executors.

C.

It reduces the impact on productivity if there is an outage of a build node.

D.

It decreases the load on the network.

Buy Now
Questions 12

Which statements are TRUE when doing a freshinstall of CloudBees Core 2.x?Choose 2 answers

Options:

A.

After the initial setup, the Beekeeper Upgrade Assistant will always be disabled.

B.

Only the OPTIONAL plugins selected in the Setup Wizard and their dependencies will be installed, in their latest versions.

C.

AN the OPTIONAL plugins will be installed, In the versions defined In the CAP Collection.

D.

All the REQUIRED plugins will be Installed, in the versions defined in the CAP Collection.

E.

Only the OPTIONAL plugins selected in the Setup Wizard and their dependencies will be Installed, In the versions defined in the CAP Collection.

Buy Now
Questions 13

How can you easily see if a plug in you use needs to be upgraded to a new version?

Options:

A.

Check the Jenkins Update Center.

B.

Search for the plugin in the Jenkins artifact repository.

C.

Email the maintainer.

D.

Check the plugin wiki

Buy Now
Exam Code: CCJE
Exam Name: Certified CloudBees Jenkins Engineer (CCJE)
Last Update: Nov 24, 2024
Questions: 89
CCJE pdf

CCJE PDF

$25.5  $84.99
CCJE Engine

CCJE Testing Engine

$30  $99.99
CCJE PDF + Engine

CCJE PDF + Testing Engine

$40.5  $134.99