Why is there sometimes a conflict when setting up and maintaining the test infrastructure?
During a project, a number of scrum teams delivers tested units(programs), which are subsequently integrated and tested in a traditional way.
In which test environment are the units (traditionally) tested first after integration of the units?
See the image below.
In order to test launch groceries logical test causes must be created based on the Data Combination Test. It has been agreed to use an average depth test. This means that Pairwise Testing will be applied on all data:
Test cases are designed using the classification tree below:
What is the minimum number of test cases that will be generated when using the Pairwise Testing technique? (What is ‘N’ as a minimum?)
See the image below:
In order to test the purchase of school supplies, logical test cases must be created based on the Data Combination Test. It has been agreed to use an average depth test. This means that Pairwise Testing will be applied on all data.
Test cases are designed using the classification tree below:
What is the minimum number of test cases that will be generated when using the Pairwise Testing technique? (What is “N” as a minimum?)
It has been decided to test the relationship between functions and data. A coverage type has been chosen from the ‘Data’ coverage types group. Which coverage types has been selected?
See the specification below:
A specification has parameters A, B, and C.
A and B each have 3 equivalence classes and C has 2 equivalence classes.
What is the minimum number of test situations that is generated if the coverage type Pairwise Testing is used?