Please read this scenario prior to answering the question

You are working as Chief Enterprise Architect at a large Internet company. The company has many divisions, ranging from cloud to logistics. The company has grown rapidly, expanding from initially selling physical books and media to a range of services including an online marketplace, live-streaming. eBooks. and cloud services.

Overall management of the numerous divisions has become challenging. Recent high-profile projects have overrun on budget and under delivered, damaging the company's reputation, and adversely impacting its share price. There is a widely held view within the executive management that the organization structure has played a major role in these project failures.

The company has an established Enterprise Architecture program based on the TOGAF standard, sponsored jointly by the Chief Executive Officer (CEO) and Chief Information Officer (CIO). The CEO has decided that the company needs to reorganize its divisions around artificial intelligence and machine learning with a focus on automation. The CEO has worked with the Enterprise Architects to create a strategic architecture for the reorganization, including an Architecture Vision, together with definitions for the four domain architectures. This sets out an ambitious vision of the future of the company over a three-year period. This includes a set of work packages and includes three distinct transformations.

The CIO has made it clear that prior to the approval of the detailed Implementation and Migration plan, the EAteam will need to assess the risks associated with the proposed architecture. He has received concerns from key stakeholders across the company that the proposed reorganization may be too ambitious and there is doubt whether it can produce sufficient value to warrant the risks.

Refer to the scenario

You have been asked to recommend an approach to satisfy these concerns. Based on the TOGAF Standard, which of the following is the best answer?

Options:

A.

The Enterprise Architects should evaluate the organization's readiness to undergo change. This will allow the risks associated with the transformations to be identified, classified, and mitigated for. This should include identifying dependencies between the set of changes, including gaps and work packages. It will also identify improvement actions to be worked into the Implementation and Migration Plan. The business value, effort, and risk

B.

The Enterprise Architects should bring together information about potential approaches and produce several alternative target transition architectures. They should then investigate the different architecture alternatives and discuss these with stakeholders using the Architecture Alternatives and Trade-offs technique. Once the target architecture has been selected, it should be analyzed using a state evolution table to determine the Transiti

C.

Establishing interoperability in alignment with the corporate operating model will ensure risks are minimized. The Enterprise Architects should apply an interoperability analysis to evaluate any potential issues across the architecture. This should include the development of a matrix showing the interoperability requirements. These can then be included within the transformation strategy embedded in the target transition architectures. The E

D.

Before preparing the detailed Implementation and Migration plan, the Enterprise

Architects should review and consolidate the gap analysis results from Phases B to

This will identify the transformations required to achieve the proposed Target

Architecture. The Enterprise Architects should then assess the readiness of the

organization to undergo change and determine an overall direction to address and

mitigate ri

Buy Now
Questions 5

Scenario

You are working as an Enterprise Architect within a large manufacturing company. The company has multiple divisions located worldwide.

After a recent study, senior management is concerned about the impact of the company’s multiple data centers and duplication of applications on business efficiency. To address this concern, a strategic architecture has been defined; it will help improve the ability to meet customer demand and improve the efficiency of operations. The strategic architecture involves the consolidation of multiple application programs that are currently used in different divisions and putting them all onto a cloud-based solution instead.

Each division has completed the Architecture Definition documentation to meet its own specific operational requirements. The enterprise architects have analyzed the corporate changes and implementation constraints. A consolidated gap analysis has been completed. Based on its results, the architects have reviewed the requirements, dependencies, and interoperability requirements needed to integrate the cloud-based solution. The architects have completed the Business Transformation Readiness Assessment. Based on all these factors, they have produced a risk assessment. They have also completed the draft Implementation and Migration Plan, the draft Architecture Roadmap, and the Capability Assessment deliverables.

Due to the risks of changing from the current environment, the decision has been taken that a gradual approach is needed to implement the target architecture. It will likely take a few years to complete the whole implementation process.

The company has a mature Enterprise Architecture (EA) practice and uses the TOGAF standard for its architecture development method. The EA practice is engaged throughout all the divisions, with implementation governance assigned to a business line. In addition to providing guidance on using architecture frameworks, including business planning, project/portfolio management, and operations management, the EA program is sponsored by the Chief Information Officer (CIO).

You have been asked to decide on the next steps for the migration planning.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You update the Architecture Definition Document, which includes setting project objectives and documenting the final requirements. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the Implementation and Migration Plan. You recommend that lessons learned be applied as changes to the archi

B.

You conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment verifies that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then you would identify changes to performance requirements and update those in the Imp

C.

You examine how the Implementation and Migration Plan affects the other frameworks being used in the organization. You coordinate the planning with the business planning, project/portfolio management, and operations management frameworks. You assign a business value to each project, considering the available resources and how well they align with the strategy. You then update the architecture roadmap and the Implementation and Migration Pla

D.

You assess the business value for each project by applying the Business Value Assessment Technique. The assessment should focus on return on investment and performance evaluation criteria to prioritize the most progress of the architecture transformation. You confirm and plan a series of Transition Architecture phases using an Architecture Definition Increments Table. You document the lessons learned and generate the final Implementation an

Buy Now
Questions 6

Please read this scenario prior to answering the question

You are working as an Enterprise Architect within a healthcare and life science company. The company is a

leading player in its industry, dedicated to transforming healthcare with new ideas and advancements. The

company has multiple divisions that cover different aspects of the business.

The company's Enterprise Architecture (EA) department has been operating for several years and has

mature, well-developed architecture governance and development processes following the TOGAF

Standard. In addition to the EA program, the company has a number of management frameworks in use.

The Architecture Board includes representatives from each division of the company.

Many of the company's rivals have begun utilizing Artificial Intelligence (Al) in their operations, and the

indications are that this will be transformative for healthcare delivery. This is something the EA department

has been interested in for a while, and they had recently submitted an architecture Change Request which

was approved. As a result, the CIO has approved a Request for Architecture Work to investigate the

implementation of Al in the company.

Areas for evaluation include:

How can staff use Al daily in their current role?

How Al can enhance access to care for patients, and how to make that experience seamless?

How Al can offer new workplace platforms and tools to increase efficiency?

Some of the top managers are worried about a change in the way of working, and if it will achieve the goals.

Many are not confident that the company's risk management processes are adequate for a company-wide

integration of generative Al. There are also questions from staff about whether enough specific guidelines

and polices have been put in place for responsible use of Al.

The Chief Information Officer (CIO) is the sponsor of the Enterprise Architecture program. The CIO has

actively encouraged architecting with agility within the EA department as her preferred approach for projects.

The CIO wants to know how to address these concerns and reduce risks.

Refer to the scenario

You have been tasked with starting the architecture development. How do you begin?

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You recommend that an analysis of the stakeholders is undertaken. This will allow the architects to

define groups of partners (the stakeholders) who have common concerns and include development

of a Stakeholder Map. The concerns and relevant views should then be defined for each group and

recorded in the Architecture Vision document. To mitigate risk, you include a requirement that there

be progressive development of

B.

You recommend that a Communications Plan be created to address the key stakeholders, that is the

most powerful and influential partners. This plan should include a report that summarizes the key

features of the architecture with respect to each location and reflects the stakeholders' requirements.

You will check with each key stakeholder that their concerns are being addressed. Risk mitigation

should be explicitly ad

C.

You recommend that models be created for the Draft Business, Data, Application, and Technology

Architectures. These can be used to ensure that the system will be compliant with the local

regulations for each division. Together with the problem description, and requirements, this ensures

that all the necessary data and detail is addressed. A formal review should be held with the

stakeholders to verify that their conce

D.

You recommend creation of a set of business models that can be applied uniformly across all Al-

related architecture projects. These should be developed in the portable format to ensure maximum

portability across the many tools used in the firm. Each architecture should then be defined based on

this fixed set of models. All concerned parties can then examine the models to ensure that their

needs have been addressed.<

Buy Now
Questions 7

Scenario:

You are working as an Enterprise Architect at a large company. The company runs a chain of home improvement stores, as well as a website for selling products. The website lets many brands work with the company.

The stores open seven days a week and use a standard method to track sales and inventory. This involves sending accurate and timely sales data to a central inventory management system that can predict demand, adjust stock levels, and automate reordering. The website is supported by regional fulfillment centers and also uses the central inventory management system. The central inventory management system is housed at the company’s central data center.

The company has agreed to merge with a major competitor. The leadership teams of both organizations have said they are committed to a smooth transition for customers. All stores will keep their own brand names. They will combine the systems of the organizations, which includes merging retail operations and systems. Duplicated systems will be replaced with one standard retail management system. Additionally, they will reduce the number of applications being used. The CIO expects that these changes will lead to substantial cost savings for the newly merged company.

An enterprise plan for both organizations has been created. The aim is to set priorities for the transition, especially in terms of information management and application development. It is crucial to make decisions that will create long-term value.

The company has a mature Enterprise Architecture (EA) practice and uses the TOGAF standard for its architecture development method. The EA program is sponsored by the Chief Information Officer (CIO).

The Request for Architecture Work to oversee the transition has been approved. The project has been scoped, and you have been assigned to work on it.

You have been asked to confirm the most relevant architecture principles for the transition.

Based on the TOGAF Standard, which of the following is the best answer?

Options:

A.

Control Technical Diversity, Interoperability, Data is an Asset, Data is Shared, Business Continuity

B.

Service Orientation, Compliance with the Law, Requirements Based Change, Responsive Change Management, Data Security

C.

Common Use Applications, Data is an Asset, Common Vocabulary and Data Definitions, Maximize Benefit to the Enterprise, Business Continuity

D.

Ease of Use, Common Use Applications, Data is an Asset, Technology Independence, Business Continuity

Buy Now
Questions 8

Please read this scenario prior to answering the question

You have been appointed as Chief Enterprise Architect (CEA). reporting to the Chief Technical Officer (CTO), of a company established as a separate operating entity by a major automotive manufacturer. The mission of the company is to build a new industry leading unified technology and software platform for electric vehicles.

The company uses the TOGAF Standard as the basis for its Enterprise Architecture (EA) framework, and architecture development follows the purpose-based EA Capability model as described in the TOGAF Series Guide: A Practitioners'Approach to Developing Enterprise Architecture Following the TOGAF® ADM.

An end-to-end Target Architecture has been completed with a roadmap for change over a five-year period. The new platform will be a cross-functional effort between hardware and software teams, with significant changes over the old platform. It is expected to be developed in several stages over three years. The EA team has inherited the architecture for the previous generation hardware and software automotive platform, some of which can be carried over to the new unified platform. The EA team has started to define the new platform, including defining which parts of the architecture to carry forward.

Enough of the Business Architecture has been defined, so that work can commence on the Information Systems and Technology Architectures. Those need to be defined to support the core business services that the company plans to provide. The core services will feature an innovative approach with swarm data generated by vehicles, paving the way for autonomous driving in the future.

The presentation and access to different variations of data that the company plans to offer through its platform pose an architecture challenge. The application portfolio and supporting infrastructure need to interact with various existing cloud services and data-

Refer to the scenario

You have been asked what approach should be taken to determine and organize the work to deliver the requested architectures?

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You would look outside the enterprise to research data models and application portfolios of leading big data businesses. You would develop just enough applications, data, and technology architecture to identify options. For each project this should include identification of candidate architecture and solution building blocks. You will identify solution providers, perform a readiness assessment, and assess the viability and fitness of the so

B.

You would refer to the end-to-end Target Architecture for guidance and direction. The first objective should be to identify projects, dependencies and synergies, then prioritize before initiating the projects. You will develop high-level architecture descriptions. For each project you would estimate effort size, identify reference architectures, and candidate building blocks. You will identify the resource needs considering cost and value.

C.

You will revisit ADM Phase A. identifying the stakeholders and creating a new Architecture Vision. You will update the Stakeholder map produced for the strategic architecture so it reflects the stakeholders who are now the most relevant to the projects that are to be developed. You would then ask the CTO to make some decisions about the Architecture Roadmap, and update the Implementation and Migration Plan to reflect the decisions.

D.

You will research leading data businesses, developing high-level Target Data, Application and Technology Architectures. You would review the Architecture Vision in order to estimate the level of detail, time, and breadth of the ADM cycle phases that will be needed to develop the architecture. You will identify and cost major work packages, and then develop an Architecture Roadmap. You would then seek approval by the Architecture Board and i

Buy Now
Questions 9

Please read this scenario prior to answering the question

You are the Lead Enterprise Architect at a major agribusiness company. The company's main

annual harvest is lentils, a highly valued food grown worldwide. The lentil parasite, broomrape,

has been an increasing concern for many years and is now becoming resistant to chemical

controls. In addition, changes in climate favor the propagation and growth of the parasite. As a

result, the parasite cannot realistically be exterminated, and it has become pandemic, with lentil

yields falling globally.

The CEO appreciates the seriousness of the situation and has set out a change in direction

that is effectively a new business for the company. There are opportunities for new products,

and new markets. The company will use the fields for another harvest and will cease to process

third-party lentils. Thus, the target market will change, and the end-products will be different

and more varied. This is a major decision and the CEO has stated a desire to repurpose rather

than replace so as to manage the risks and limit the costs.

The company has a mature Enterprise Architecture practice based in its headquarters and uses

the TOGAF standard as the method and guiding framework. The practice has an established

Architecture Capability, and uses iteration for architecture development. The CIO is the sponsor

of the activity.

The CIO has assigned the Enterprise Architecture team to this activity. At this stage there is no

shared vision, or requirements.

Refer to the scenario

You have been asked to propose the best approach for architecture development to realize the

CEO's change in direction for the company.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You propose that the team focus on architecture definition, with emphasis on defining

the change parameters to support this new business strategy that the CEO has

identified. Once understood, the team will be in the best position to identify the

requirements, drivers, issues, and constraints for the change. You would ensure that the

architecture development addresses non-functional requirements to assure that the

B.

You propose that this engagement define the baseline Technology Architecture first in

order to assess the current infrastructure capacity and capability for the company. Then

the focus should be on transition planning and incremental architecture deployment.

This will identify requirements to ensure that the projects are sequenced in an optimal

fashion so as to realize the change.

C.

You propose that the priority is to understand and bring structure to the definition of the

change. The team should focus iteration cycles on a baseline first approach to

architecture development, and then transition planning. This will identify what needs to

change in order to transition from the baseline to the target, and can be used to work out

in detail what the shared vision is for the change.

D.

You propose that the team focus its iteration cycles on architecture development by

going through the architecture definition phases (B-D) with a baseline first approach.

This will support the change in direction as stated by the CEO. It will ensure that the

change can be defined in a structured manner and address the requirements needed to

realize the change.

Buy Now
Questions 10

Please read this scenario prior to answering the question

You are the Chief Enterprise Architect at a large food service company specializing in sales to trade and

wholesale, for example, restaurants and other food retailers.

One of your company's competitors has launched a revolutionary product range and is running a very

aggressive marketing campaign. Your company's resellers are successively announcing that they are not

interested in your company's products and will sell your competitor's.

The CEO has stated there must be significant change to address the situation. He has made it clear that

new markets must be found for the company's products, and that the business needs to pivot, and address the retail market as well as the existing wholesale market.

A consideration is the company's ability and willingness to change its business model, and if it is a temporary or permanent change. An additional risk factor is one of culture. The company has been used to a stable business with a reasonably well known and settled client base - all with its own local understandings and practices.

The CEO is the sponsor of the EA program within the company. You have been engaged with the sales,

logistics, production, and marketing teams, enabling the architecture activity to start. An Architecture Vision, Architecture Principles, and Requirements have all been agreed. As you move forward to develop a possible Target Architecture you have identified that some of the key stakeholders' preferences are incompatible. The incompatibilities are focused primarily on time-to-market, cost savings, and the need to bring out a fully featured product range, but there are additional factors.

Refer to the scenario

You have been asked how you will address the incompatibilities between key stakeholder preferences.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You would seek to understand value preferences and priorities of the stakeholders. You would

develop alternative Target Architectures, highlighting the gaps between current state and the

alternatives. You would consider combining features from one or more alternatives in collaboration

with the stakeholders. A formal stakeholder review should then be held to decide which alternative is

fit for purpose and should be mo

B.

You recommend that since the CEO has stated that the company must pivot, it is better to

compromise on a full product range rather than time-to-market. You would develop just enough of the

Target Architecture to demonstrate fitness of the proposed approach. You would limit the description

to just where there is a gap between the current baseline. You would seek approval by the

stakeholders to move forward with develo

C.

You would use the Architecture Vision, Principles, and Requirements to define a set of criteria for

alternatives and create a set of architecture views to illustrate the impact of the alternative Target

Architectures. You would identify the impact on planned projects. You would understand the strengths

and weaknesses of the alternatives. You would conduct a formal stakeholder review to decide which

alternative to mov

D.

You would review the Stakeholder Map and ensure that you have addressed and represented the

concerns of all department heads. You will involve them in resolving the incompatibilities. The

Communications Plan should include a report that summarizes the key features of the architecture

with and how incompatibilities were resolved to reflects the stakeholders' requirements. You will

check with each key stakeholder they

Buy Now
Questions 11

Scenario:

You are working as an Enterprise Architect within a company providing legal services. The company operates in many countries and has a complicated structure. Every office must follow the local regulations in their country.

The company’s Enterprise Architecture (EA) department has been operating for several years and has mature, well-developed architecture governance and development processes based on the TOGAF standard. In addition to the EA program, the company has several management frameworks, including business planning, project/portfolio management, and operations management. The Architecture Board includes representatives from all parts of the company.

The Chief Information Officer (CIO) is the sponsor of the Enterprise Architecture program. The CIO has actively encouraged architecting with agility within the EA department as the preferred approach for projects. The CIO has given approval for a Request for Architecture Work to explore the adoption of an AI-powered system for managing legal cases and financial processes.

Senior management has become more concerned about business performance, especially with the advancements in Artificial Intelligence (AI). Many of the company’s competitors have started using AI to assist with legal strategies, streamline processes, and boost productivity. One of the most important benefits AI has for the business is its ability to increase accuracy and minimize mistakes.

Some of the top managers are worried about a change in the way of working, and if it will achieve the business goals. Their staff also fear that management will use the AI system to measure their performance. The CIO wants to know how to address these concerns and reduce risks.

The new system is expected to guide legal professionals and analysts on which tasks to focus on. The main goals are to improve productivity and make better use of staff. In addition, the CIO hopes these changes will lead to higher customer satisfaction.

Refer to the scenario:

You have been asked to respond to the Chief Information Officer (CIO) recommending an approach that would enable the development of an architecture that addresses the concerns of the top managers and the multiple branches in different parts of the company.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend that models be created for each of the Business, Application, and Technology architectures. These can be used to ensure that the system will be compliant with the local regulations for each operating entity. This ensures that all necessary data and detail is addressed. A formal review should be held with the stakeholders to verify that their concerns have been properly addressed by the models

B.

You recommend that an analysis of the stakeholders is undertaken. This will allow the architects to define groups of partners (the stakeholders) who have common concerns and include development of a Stakeholder Map. The concerns and relevant views should then be defined for each group and recorded in the Architecture Vision document. To reduce risk, you include a requirement that there be progres

C.

You recommend creation of a set of business models that can be applied uniformly across all AI-related architecture projects. These should be developed in a portable format to ensure maximum portability across the many tools used in the firm. Each architecture should then be defined based on this fixed set of models. All concerned stakeholders can then examine the models to ensure that their needs have

D.

You recommend that a Communications Plan be created to address the key stakeholders, particularly influential partners. This plan should include a report summarizing the key features of the architecture with respect to each location and reflect the stakeholders’ requirements. You will check with each key stakeholder that their concerns have been addressed. Risk mitigation should be explicitly add

Buy Now
Questions 12

Please read this scenario prior to answering the question

You are serving as the Lead Architect for an Enterprise Architecture team within a leading multinational biotechnology company. The company works in three major industries, including healthcare, crop production, and agriculture. Your team works within the healthcare division.

The healthcare division is developing a new vaccine, and has to demonstrate its effectiveness and safety in a set of clinical trials that satisfy the regulatory requirements of the relevant health authorities. The clinical trials are undertaken by its research laboratories at multiple facilities worldwide. In addition to internal research and development activities, the healthcare division is also involved in publicly funded collaborative research projects with industrial and academic partners.

The Enterprise Architecture team has been engaged in an architecture project to develop a secure system that will allow the healthcare researchers to share information more easily about their clinical trials, and work more collaboratively across the organization and also with its partners. This system will also connect with external partners.

The Enterprise Architecture team uses the TOGAF ADM with extensions required to support healthcare manufacturing practices and laboratory practices. Due to the highly sensitive nature of the information that is managed, special care has been taken to ensure that each architecture domain considers the security and privacy issues that are relevant.

The Vice President for Worldwide Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that disruptions must be minimized for the clinical trials, and that the rollout must be undertaken incrementally.

Refer to the scenario

You have been asked to recommend the approach to identify the work packages for an incremental rollout meeting the requirements.

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You recommend that the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix be grouped into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture, so that the implementation team can schedule the rollout one region at a time to minimize disruption. D

B.

You recommend that a Consolidated Gaps. Solutions and Dependencies Matrix is used as a planning tool for creating work packages. For each gap classify whether the solution is either a new development, purchased solution, or based on an existing product. Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture considering the sched

C.

You recommend that an Implementation Factor Catalog is drawn up to indicate actions and constraints. A Consolidated Gaps. Solutions and Dependencies Matrix should also be created. For each gap. identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar activities together to form work packages. Identify dependencies between work packages factoring in the clinical trial

D.

You recommend that the set of required Solution Building Blocks be determined by identifying those which need to be developed and which need to be procured. Eliminate any duplicates. Group the remaining Solution Building Blocks together to create the work packages using a CRUD (create, read, update, delete) matrix. Rank the work packages and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedu

Buy Now
Questions 13

Scenario

You are working as an Enterprise Architect within an Enterprise Architecture (EA) team at a global company that sells consumer products. The company produces many products that buyers use and enjoy.

The company has announced a major change to its products that will occur over a four-year period. This change includes the introduction of digital products and services. An architecture to support this strategy has been finished, along with a roadmap for a set of projects to implement this significant change. This will be a cross-functional effort between the product design and software teams. It is planned to be developed in phases.

The company faces a challenge in presenting and providing access to different services through its products and digital platforms while ensuring compliance with data privacy laws. In some countries and regions, the data residency requirements mean that the company has to store certain data within the region where it is collected. As a result, the company’s application portfolio and infrastructure must connect with various cloud services and data repositories in different countries.

The EA team has inherited the architecture used by the current products, some of which can be carried over to the new products. The EA team has started to define which parts of the architecture to carry forward. Enough of the Business Architecture has been defined so that work can commence on the Information Systems and Technology Architectures. Those architectures need to be defined to support the key digital services that the company plans to provide.

The company uses the TOGAF Standard as the foundation for its Enterprise Architecture framework, and architecture development follows the purpose-based EA Capability model outlined in the TOGAF Series Guide: A Practitioner’s Approach to Developing Enterprise Architecture Following the TOGAF ADM. The EA team reports to the Chief Information Officer (CIO), who oversees the program.

You have been asked how to decide and organize the work to deliver the requested architectures.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You refer to the superior architecture for guidance. You review the projects identified, their dependencies, and synergies, then decide the sequence for starting the projects. You develop high-level architecture descriptions. For each project, you determine how much work is needed, identify reference architectures, and candidate building blocks. You identify the resource needs taking into account cost and value. You document the different o

B.

You look outside the company to study how other companies organize their data models and application portfolios. You create just enough architecture description for the Application, Data, and Technology Architectures to identify the different options. For each project, this includes identification of candidate architecture and solution building blocks. You then identify solution providers, perform a readiness assessment, and assess the viab

C.

You research leading data companies, using your findings to help in developing high-level Target Data, Application, and Technology Architectures. You review the Architecture Vision to determine the level of detail, time, and scope of the ADM cycle phases required for each project. You identify and estimate the cost of the main resources. You then prepare an Architecture Roadmap and request the Architecture Board to review the roadmap. You t

D.

You commence an iteration of ADM Phase A, identifying the stakeholders and revising the Architecture Vision. You perform a Stakeholder Analysis and update the Stakeholder Map. You conduct workshops and interviews to reflect the stakeholders who are now the key drivers for the digital products and services. You coordinate with the CIO to ensure alignment with the overall roadmap and update the Implementation and Migration Plan accordingly.

Buy Now
Questions 14

You are working as an Enterprise Architect within the Enterprise Architecture (EA) team at a healthcare and life sciences company. The EA team is developing a secure system for researchers to share clinical trial information easily across the organization and with external partners.

Due to the highly sensitive nature of the information, each architecture domain must consider privacy and safety concerns. The healthcare division has been directed to minimize disruptions to clinical trials while introducing the new system gradually.

How would you identify the work packages for introducing the new system? Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

Use a Consolidated Gaps, Solutions, and Dependencies Matrix to create work packages and sequence them into Capability Increments. Document in a Transition Architecture State Evolution Table.

B.

Identify Solution Building Blocks for development or procurement, then use a CRUD matrix to rank and select the most cost-effective work packages. Schedule the rollout sequentially across regions.

C.

Use a Consolidated Gaps, Solutions, and Dependencies Matrix to classify each solution, group them into work packages, then regroup into Capability Increments. Document in an Architecture Definition Increments Table.

D.

Draw up an Implementation Factor Catalog to indicate actions and constraints. Use a Consolidated Gaps, Solutions, and Dependencies Matrix, then group similar activities into work packages and identify dependencies.

Buy Now
Questions 15

You are working as an Enterprise Architect within an Enterprise Architecture (EA) team at a multinational energy company. The company is committed to becoming a net-zero emissions energy business by 2050. To achieve this, the company is focusing on shifting to renewable energy production and adopting eco-friendly practices.

The EA team, which reports to the Chief Technical Officer (CTO), has been tasked with overseeing the transformation to make the company more effective through acquisitions. The company plans to fully integrate these acquisitions, including merging operations and systems.

To address the integration challenges, the EA team leader wants to know how to manage risks and ensure that the company succeeds with the proposed changes. Based on the TOGAF Standard, which of the following is the best answer?

Options:

A.

The EA team should create a Business Scenario to fully describe the business problem that is being addressed by the transformation. Once requirements are identified, they should be evaluated in terms of risks. Any residual risks should be escalated to the Architecture Board.

B.

The EA team should develop Business Architecture views that demonstrate how stakeholder concerns are addressed and assess each factor for readiness, urgency, and degree of difficulty.

C.

The EA team should evaluate the company’s readiness for change by identifying factors that will impact the transformation. These factors will be used to determine initial risks associated with the initiative.

D.

The EA team should document the risks associated with the transformation in an Implementation Factor Catalog to inform decisions during implementation and deployment.

Buy Now
Questions 16

Please read this scenario prior to answering the question

You have been appointed as senior architect working for an autonomous driving technology development company. The mission of the company is to build an industry leading unified technology and software platform to support connected cars and autonomous driving.

The company uses the TOGAF Standard as the basis for its Enterprise Architecture (EA) framework. Architecture development within the company follows the purpose-based EA Capability model as described in the TOGAF Series Guide: A Practitioners'Approach to Developing Enterprise Architecture Following the TOGAF® ADM.

An architecture to support strategy has been completed defining a long-range Target Architecture with a roadmap spanning five years. This has identified the need for a portfolio of projects over the next two years. The portfolio includes development of travel assistance systems using swarm data from vehicles on the road.

The current phase of architecture development is focused on the Business Architecture which needs to support the core travel assistance services that the company plans to provide. The core services will manage and process the swarm data generated by vehicles, paving the way for autonomous driving in the future.

The presentation and access to different variations of data that the company plans to offer through its platform poses an architecture challenge. The application portfolio needs to interact securely with various third-party cloud services, and V2X (Vehicle-to-Everything) service providers in many countries to be able to manage the data at scale. The security of V2X is a key concern for the stakeholders. Regulators have stated that the user's privacy be always protected, for example, so that the drivers' journey cannot be tracked or reconstructed by compiling data sent or received by the car.

Refer to the scenario

You have been asked to describe the risk and security considerations you would include in the current phase of the architecture development?

Based on the TOGAF standard which of the following is the best answer?

Options:

A.

You will focus on the relationship with the third parties required for the travel assistance systems and define a trust framework. This will describe the relationship with each party. Digital certificates are a key part of the framework and will be used to create trust between parties. You will monitor legal and regulatory changes across all the countries to keep the trust framework in compliance.

B.

You will perform a qualitative risk assessment for the data assets exchanged with partners. This will deliver a set of priorities, high to medium to low, based on identified threats, the likelihood of occurrence, and the impact if it did occur. Using the priorities, you would then develop a Business Risk Model which will detail the risk strategy including classifications to determine what mitigation is enough.

C.

You will focus on data quality as it is a key factor in risk management. You will identify the datasets that need to be safeguarded. For each dataset, you will assign ownership and responsibility for the quality of data needs. A security classification will be defined and applied to each dataset. The dataset owner will then be able to authorize processes that are trusted for a certain activity on the dataset under certain circumstances.

D.

You will create a security domain model so that assets with the same level can be managed under one security policy. Since data is being shared across partners, you will establish a security federation to include them. This would include contractual arrangements, and a definition of the responsibility areas for the data exchanged, as well as security implications. You would undertake a risk assessment determining risks relevant to specific

Buy Now
Questions 17

Scenario

You are working as an Enterprise Architect within an Enterprise Architecture (EA) team at a large government agency. The agency has multiple divisions.

The agency has a well-established EA practice and follows the TOGAF standard as its method for architecture development. Along with the EA program, the agency also uses various management frameworks, including business planning, project/portfolio management, and operations management. The EA program is sponsored by the Chief Information Officer (CIO), who has actively promoted architecting with agility within the EA department as her preferred approach for projects.

The government has mandated that the agency prepare themselves for an Artificial Intelligence (AI)-first world, which they have called their “AI-first” plan. As a result, the agency is looking to determine the impact and role that AI will play moving forward. The CIO has approved a Request for Architecture Work to look at how AI can be used for services across the agency. She has noted that digital platforms will be a priority for investment in order to scale the AI applications planned. Using AI to automate tasks and make things run smoother is seen as a big advantage. Process automation and improved efficiency from manual, repetitive activities have been identified as the key benefits of applying generative AI to their agency’s business. This will include back-office automation, for example, for help center agents who receive hundreds of email inquiries. This should also improve services for citizens by making them more efficient and personalized, tailored to each individual’s needs.

Many of the agency leaders are worried about relying too much on AI. Some leaders think their employees will need to learn new skills. Some employees are worried they might lose their jobs to AI. Other leaders worry about security and cyber resilience in the digital platforms needed for AI to be successful.

The leader of the Enterprise Architecture team has asked for your suggestions on how to address the concerns, and how to manage the risks of a new architecture for the AI-first project.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend creating an Organization Map to display the links between different parts of the agency. This will help the EA team to find and involve all areas of the agency impacted by this strategic change. Multiple business models should then be created that can be applied to AI-related projects. A meeting will be held with the stakeholders to teach them how to interpret the models and see how their concerns are being addressed. Risk wil

B.

You recommend that the key stakeholders be formally identified. This should include those who will be most helpful for the change to be successful. A Communication Plan should be made to address their needs. This plan should include a report that summarizes the key features of the architecture based on stakeholder requirements and addressing concerns. You communicate with each key stakeholder to make sure their concerns are being addressed.

C.

You recommend conducting an analysis of the stakeholders. This involves documenting the positions, concerns, issues, and cultural factors of each group. This information will shape how the architecture is to be presented and communicated. The concerns and relevant views can then be defined for each group and recorded in the Architecture Vision document. The requirements for addressing risk should be recorded in the Architecture Requirements

D.

You recommend conducting an analysis that separates the different types of stakeholders into groups. They can be divided into categories: corporate functions, end-user organization, project team, external vendors, and external partners. A model will be developed for each stakeholder category to ensure that all the necessary information and actions are taken into account. Meetings will be arranged with stakeholders to verify that their conce

Buy Now
Questions 18

Please read this scenario prior to answering the question

Your role is that of a consultant to the Lead Enterprise Architect to an international supplier of

engineering services and automated manufacturing systems. It has three manufacturing plants

where it assembles both standard and customized products for industrial production

automation. Each of these plants has been operating its own planning and production

scheduling systems, as well as applications and control systems that drive the automated

production line.

The Enterprise Architecture department has been operating for several years and has mature,

well-developed architecture governance and development processes that are based on the

TOGAF Standard. The CIO sponsors the Enterprise Architecture.

During a recent management meeting, a senior Vice-President highlighted an interview where

a competitor company's CIO is reported as saying that their production efficiency had been

improved by replacing multiple planning and scheduling systems with a common Enterprise

Resource Planning (ERP) system located in a central data center. Some discussion followed,

with the CIO responding that the situations are not comparable, and the current architecture is

already optimized.

In response, the Architecture Board approved a Request for Architecture Work covering the

investigations to determine if such an architecture transformation would lead to improvements

in efficiency. You have been assigned to support the architecture team working on this project.

A well-known concern of the plant managers is about the security and reliability of driving their

planning and production scheduling from a remote centralized system. Any chosen system

would also need to support the current supply chain network consisting of local partners at

each of the plants.

Refer to the scenario

You have been asked to explain how you will initiate the architecture project.

Based on the TOGAF Standard, which of the following is the best answer?

Options:

A.

You would research vendor literature and conduct a series of briefings with vendors

that are on the current approved supplier list. Based on the findings from the

research, you would define a preliminary Architecture Vision including summary

views, high-level requirements, and high-level definitions of the baseline and target

environments from a business, information systems, and technology perspective. You

wou

B.

You would conduct a pilot project that will enable vendors to demonstrate potential

off-the-shelf solutions that address the concerns of the stakeholders. Running a pilot

project will save time and money later in the process. Based on the findings of that

pilot project, a complete set of requirements can then be developed that will drive the

evolution of the architecture. Once the requirements are completed, a formal

C.

You would hold a series of interviews at each of the manufacturing plants using the

business scenarios technique. This will allow you to understand the systems and

integrations with local partners. You would use stakeholder analysis to identify key

players in the engagement, and to understand their concerns. You will then identify

and document the key high-level stakeholder requirements for the architecture. You

<
D.

You would develop baseline and target Architectures for each of the manufacturing

plants, ensuring that the views corresponding to selected viewpoints address key

concerns of the stakeholders. A business case, together with performance metrics

and measures should be defined to ensure the architecture meets the business

needs. A consolidated gap analysis between the architectures will then validate the

approach

Buy Now
Questions 19

According to the TOGAF standard, what term describes an individual with an interest in a system?

Options:

A.

stakeholder

B.

consumer

C.

lead architect

D.

sponsor

Buy Now
Questions 20

Consider the following ADM phases objectives.

Objective

1-Determine whether an incremental approach is required, and if so identify Transition Architectures that will deliver continuous business value

2-Generate the initial complete version of the Architecture Roadmap, based upon the gap analysis and candidate Architecture Roadmap components from Phases B, C, and D

3-Finalize the Architecture Roadmap and the supporting Implementation and Migration Plan

4-Ensure that the business value and cost of work packages and Transition Architectures is understood by key stakeholders

Which phase does each objective match?

Options:

A.

1E-2F-3E-4F

B.

1G-2E-3F-4F

C.

1E-2E-3F-4F

D.

1F-2E-3F-4G

Buy Now
Questions 21

Complete the following sentence. In the ADM, documents which are under development and have not undergone any formal review and approval process are called______ Documents which have been reviewed and approved are called ______

Options:

A.

"draft"- "finalized"

B.

"draft" - "approved"

C.

"concept" - "deliverable"

D.

"Version 0.1" - "Version 1.0"

Buy Now
Questions 22

Complete the sentence The purpose of the Preliminary Phase is to_____________.

Options:

A.

describe the target architecture

B.

define the enterprise strategy

C.

identify the stakeholders and their requirements

D.

architect an Enterprise Architecture Capability

Buy Now
Questions 23

Which of the following does the TOGAF standard describe as a package of functionality defined to meet business needs across an organization?

Options:

A.

An application

B.

A deliverable

C.

A solution architecture

D.

A building block

Buy Now
Questions 24

Consider the following ADM phases objectives.

Which phase does each objective match?

Options:

A.

1C-2B-3A-4C

B.

1A-2B-3C-4D

C.

1B-2D-3A-4C

D.

1C-2D-3B-4A

Buy Now
Questions 25

Consider the following statements

1 A whole corporation or a division of a corporation

2 A government agency or a single government department

3 Partnerships and alliances of businesses working together such as a consortium or supply chain

What are those examples of according to the TOGAF Standard?

Options:

A.

Enterprises

B.

Business Units

C.

Organizations

D.

Architectures Scopes

Buy Now
Questions 26

Which of the following is included as part of Architecture Governance1?

Options:

A.

Ensuring compliance with internal and external standards and regulatory obligations

B.

Creating and maintaining the Statement of Architecture Work though out the ADM cycle

C.

Managing Stakeholders and their requirements

D.

Interacting with the CxO level on Enterprise Architecture

Buy Now
Questions 27

Which section of the TOGAF template for Architecture Principles should highlight the business benefits of adhering to the principle?

Options:

A.

Rationale

B.

Name

C.

Implications

D.

Statement

Buy Now
Questions 28

What are the following activities part of?

• Initial risk assessment

• Risk mitigation and residual risk assessment

• Risk monitoring

Options:

A.

Risk Management

B.

Phase A

C.

Security Architecture

D.

Phase C

Buy Now
Questions 29

Consider the image showing basic architectural concepts.

What are items A and B?

Options:

A.

A-Architecture Viewpoint, B-Architecture View

B.

A-Architecture Board, B-Architecture Capability

C.

A-Candidate Architecture, B-Trade-off

D.

A-Requirement. B-Candidate Architecture

Buy Now
Questions 30

Consider the following statement:

According to the TOGAF Standard a governed approach of a particular deliverable will ensure a system of continuous monitoring to check integrity changes decision-making and audit of all architecture-related activities

Which deliverable is being referred to?

Options:

A.

An Architecture Contract

B.

The Architecture Definition Document

C.

The Architecture Vision

D.

The Statement of Architecture Work

Buy Now
Questions 31

What is an objective of the ADM Preliminary Phase?

Options:

A.

To develop a vision of the business value to be delivered by the proposed enterprise architecture

B.

To select and implement tools to support the Architecture Capability

C.

To obtain approval for the Statement of Architecture Work

D.

To create the initial version of the Architecture Roadmap

Buy Now
Questions 32

Which of the following are the four purposes that typically frame the planning horizon, depth and breadth of an Architecture Project, and the contents of the EA Repository-?

Options:

A.

General Foundational Subordinate and Superior Architecture

B.

Segment, Capability. Enterprise and End-to-end Target Architecture

C.

Avant-Garde Big-Bang, Discreet and Cohesive

D.

Strategy Portfolio Project Solution Delivery

Buy Now
Questions 33

What can architects present to stakeholders to extract hidden agendas, principles, and requirements that could impact the final Target Architecture?

Options:

A.

Solutions and Applications

B.

Alternatives and Trade-offs

C.

Business Scenarios and Business Models

D.

Architecture Views and Architecture Viewpoints

Buy Now
Questions 34

What is used to structure architectural information in an orderly way so that it can be processed to meet stakeholder needs?

Options:

A.

A Stakeholder Map

B.

An Architecture Framework

C.

Content Metamodel

D.

An EA Library

Buy Now
Questions 35

Which statement best describes iteration and the ADM?

Options:

A.

The ADM is iterative within the first cycle and then between phases

B.

The level of detail is defined once and applies to all iterations

C.

The ADM is sequential Iteration is applied within phases

D.

The ADM is iterative, over the whole process between phases and within phases

Buy Now
Exam Code: OGEA-103
Exam Name: TOGAF Enterprise Architecture Combined Part 1 and Part 2 Exam
Last Update: Apr 2, 2025
Questions: 119
OGEA-103 pdf

OGEA-103 PDF

$25.5  $84.99
OGEA-103 Engine

OGEA-103 Testing Engine

$30  $99.99
OGEA-103 PDF + Engine

OGEA-103 PDF + Testing Engine

$40.5  $134.99