Your customer wants to order an HCP G10 system with 2 PB usable capacity.
Which HCP G10 configuration is the most cost-effective solution for this customer?
Which combination of trays allows a HCP S31 to be configured to its maximum capacity?
What is a requirement for a running HCP system to maintain quorum for cluster operations?
You are installing an HCP G10 and are now setting the front-end connectivity. The customer has provided you with IP addresses for their network for each node.
Which two actions should be performed on each node as part of the OS installation? (Choose two.)