Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtreat

D-MSS-DS-23 Dell Midrange Storage Solutions Design 2023 Questions and Answers

Questions 4

What is a Dell Unity XT best practice to provide the highest network availability for NAS?

Options:

A.

Configure LACP with multiple active links.

B.

Configure Fail-Safe Networking with a primary link and a standby link.

C.

Combine LACP and Fail-Safe Networking.

D.

Utilize multi-pathing software such as PowerPath.

Buy Now
Questions 5

What is the maximum supported drive configuration in the base enclosure of the PowerStore 3200T?

Options:

A.

23xNVMe SCMs 2 x NVMe NVRAM

B.

21 x NVMe SSDs 2 x NVMe NVRAM

C.

23 x NVMe SSDs 2 x NVMe NVRAM

D.

21 x NVMe SCMs 4 x NVMe NVRAM

Buy Now
Questions 6

Which two workload parameters are required to proceed with sizing for a PowerStore solution? (Select 2)

Options:

A.

Response time

B.

IOPS

C.

Effective Capacity

D.

Data reduction ratio

Buy Now
Questions 7

A customer has a data center with 30 different applications running on 30 volumes presented from PowerStore. They want to design a DR site within 300 km with 15 min RPO using storage-based asynchronous replication. Which protection policy design leads to most stable storage performance?

Options:

A.

Create 15 protection policies that are assigned to a pair of volumes, each scheduled with a one minute shift from each other.

B.

Create two protection policies that are assigned to 15 volumes, each scheduled with a five minute shift from each other.

C.

Create a single protection policy assigned to 30 volumes, each scheduled with a five minute shift from each other.

D.

Create 30 protection policies that are assigned to a single volume, each scheduled with a one minute shift from each other.

Buy Now
Questions 8

Which Dell Unity XT DPE front-end port connectivity can support up to 30,000 IOPS/port and up to 1,700 MB/s?

Options:

A.

25 GbE iSCSI

B.

16 Gb FC

C.

10 GbE iSCSI and 16 Gb FC

D.

16 Gb FC and 25 GbE iSCSI

Buy Now
Questions 9

Which two parameters avoid bottlenecks and improve performance when sizing Dell Unity XT storage solutions? (Select 2)

Options:

A.

Network Bandwidth

B.

Port Utilization

C.

Port load balancing

D.

Network Latency

E.

Workload Types

Buy Now
Questions 10

For a PowerStore 3200T running Block Workloads, which two options does Sizer take into consideration to equate the performance for each workload? (Select 2)

Options:

A.

Throughput

B.

Frontend Performance Saturation

C.

Response Time

D.

Storage Performance Saturation

Buy Now
Questions 11

What result is obtained by multiplying the VM count by the Capacity per VM in a PowerStore system?

Options:

A.

Usable Capacity

B.

Raw Capacity

C.

Effective Capacity

Buy Now
Questions 12

Which two attributes characterize I/O workloads for sizing the PowerStore storage solution? (Select 2)

Options:

A.

Extent of Serialization

B.

Splitting of Workloads

C.

Random vs. Sequential I/O

D.

Read vs. Write ratios

E.

CloudIQ Reporting

Buy Now
Questions 13

Which drive type can be used in a FAST Cache pool configuration for Dell Unity XT solutions?

Options:

A.

SAS Flash 3

B.

SAS Flash 2

C.

SAS Flash 4

Buy Now
Questions 14

What action is performed in the "Create a file import session" during a PowerStore file import?

Options:

A.

Destination NAS server resources are created.

B.

Production interfaces are disabled on the source side.

C.

Options for import are specified.

D.

Source import network interface is created.

Buy Now
Questions 15

What non-Dell product reports can be generated using My Work?

Options:

A.

HP EVA and IBM SVC

B.

NetApp and HDS

C.

3PAR and IBM XIV

D.

HDS and 3PAR

Buy Now
Questions 16

What benefit do higher capacity drives provide in a Dell Unity All Flash array?

Options:

A.

Larger I/O size

B.

Less physical space is used

C.

Efficient utilization of front end ports

Buy Now
Questions 17

What is skew?

Options:

A.

Uniform distribution of I/O over storage capacity

B.

Sustained per-port IOPS

C.

Bursty per-port IOPS

D.

Non-uniform distribution of I/O over storage capacity

Buy Now
Questions 18

Which CPU family is used on a Dell Unity XT 480?

Options:

A.

Haswell

B.

Ice Lake

C.

Broadwell

D.

Skylake

Buy Now
Questions 19

Which two statements are correct in reference to an NVMe Expansion Enclosure attached to a PowerStore? (Select 2)

Options:

A.

Slots for 25 2.5-inch NVMe drives

B.

Requires v2 embedded module in base enclosure

C.

Not supported on systems that include SAS expansion enclosures

D.

Supports the use of NVMe SCM Drives

Buy Now
Questions 20

On what host operating systems can the Grab tool run?

Options:

A.

Linux, macOS, and Tru64

B.

OS/390, Windows, and Linux

C.

Windows, UNIX, and ESXi

D.

ESXi, ChromeOS, and OS/390

Buy Now
Questions 21

What is the minimum number of IP addresses for optimal performance of PowerStoreX?

Options:

A.

7

B.

4

C.

6

D.

9

Buy Now
Questions 22

Which parameters can be defined when sizing a Dell Unity XT solution using the Simple Performance method?

Options:

A.

Read size (KB) Target IOPS

B.

Write size (KB) Initial capacity (TB)

C.

Application workload type Yearly growth rate (%)

D.

Days hot Number of LUNs

Buy Now
Questions 23

What is done during the preconfigure step of a PowerStore block import migration?

Options:

A.

Source system is added to the PowerStore.

B.

Destination volume is created.

C.

Network connectivity is set up.

D.

Import schedule is set.

Buy Now
Questions 24

Which two statements are correct for a PowerStore 5200T with mixed SSD and SCM drive combination? (Select 2)

Options:

A.

Expansion Enclosures are supported.

B.

NVMe drives are not used for Caching and Vaulting.

C.

SSD drives are used for metadata tiering.

D.

SCM drives do not add to usable capacity.

Buy Now
Questions 25

An architect is designing a cost-effective PowerStore solution in sizer that is expected to perform in the event of a node failure without impacting the max performance. What must be considered?

Options:

A.

Set Max Performance Saturation to 50% while sizing.

B.

Plan and design a disaster recovery site.

C.

Set Performance Growth to 50% while sizing.

D.

Provide a higher model than the sizer-recommended solution.

Buy Now
Exam Code: D-MSS-DS-23
Exam Name: Dell Midrange Storage Solutions Design 2023
Last Update: Sep 17, 2025
Questions: 86
D-MSS-DS-23 pdf

D-MSS-DS-23 PDF

$29.75  $84.99
D-MSS-DS-23 Engine

D-MSS-DS-23 Testing Engine

$35  $99.99
D-MSS-DS-23 PDF + Engine

D-MSS-DS-23 PDF + Testing Engine

$47.25  $134.99