Black Friday Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cramtick70

CQE Certified Quality EngineerExam Questions and Answers

Questions 4

Which of the following results is an advantage of a ship-to-stock program?

Options:

A.

It replaces scheduled audits with incoming inspection.

B.

It reduces shipping costs.

C.

It reduces dock-to-line time.

D.

It reduces the need for purchaser supplier interaction.

Buy Now
Questions 5

Which of the following tools can be used to classify or determine a safety quality characteristic?

Options:

A.

An inspection plan

B.

A criticality analysis

C.

Standard work instructions

D.

A control chan

Buy Now
Questions 6

Choosing design settings to minimize the effect of noise is a goal of

Options:

A.

robust design

B.

tolerance design

C.

design verification

D.

design for maintainability

Buy Now
Questions 7

Statistical process control was originated by

Options:

A.

Deming

B.

Feigenbaum

C.

Jurau

D.

Shewhart

Buy Now
Questions 8

The probability of an accident for the head event "H" given below is:

Options:

A.

0.0700

B.

0.1125

C.

0.0689

D.

0.1100

Buy Now
Questions 9

Failure to cite the significant contributions of other individuals in a final manuscript for publication violates which category of the ASQ Code of Ethics?

Options:

A.

Fundamental Principles

B.

Relations with the Public

C.

Relations with Employers and Clients

D.

Relations with Peers

Buy Now
Questions 10

The following drawing is for a machined part.

What does the symbol

represent?

Options:

A.

Maximum material condition

B.

Gaging target position

C.

Positional tolerance target

D.

Datum target point

Buy Now
Questions 11

Which of the following quantitative methods does NOT apply to the assessment of actual system/component reliability?

Options:

A.

Statistical analysis of field test and failure data.

B.

Statistical allocation of reliability goals.

C.

Evaluation of laboratory test data.

D.

Analysis of results of reliability demonstration tests.

Buy Now
Questions 12

A material review board (MRB) gets its authority to act from which of the following functions?

Options:

A.

Executive management

B.

Purchasing

C.

Engineering

D.

National or international standards

Buy Now
Questions 13

If a value assigned to a unit is non-numerical. it is described as

Options:

A.

nonconforming

B.

quantitative

C.

variable

D.

qualitative

Buy Now
Questions 14

Typically Pareto diagrams are used for which of the following reasons?

Ⅰ. To display the significant few categories.

Ⅱ. To compliment attribute data charting.

Ⅲ. To eliminate insignificant categories.

Ⅳ. To focus attention in priority order.

Options:

A.

I and III only

B.

I, II and III only

C.

II, III and IV only

D.

I, II, III and IV

Buy Now
Questions 15

Which of the following tools can be used to show a frequency distribution?

Options:

A.

An affinity diagram

B.

An interrelationship digraph

C.

A PERT chart

D.

A check sheet

Buy Now
Questions 16

Typically, a product that exhibits a constant failure rate follows what type of distribution for thefailure rate?

Options:

A.

Lognormal

B.

Poisson

C.

Exponential

D.

Binomial

Buy Now
Questions 17

The purpose of the opening meeting for an audit is to

Options:

A.

establish the authority of the lead auditor and audit team over the auditees

B.

determine approximately how much time and what resources will be required to conduct the audit

C.

conduct introductions, review the audit's scope and procedures, and clarify details of the audit plan

D.

present the audit team's initial observations regarding the effectiveness of the auditee's quality system

Buy Now
Questions 18

The effectiveness of corrective action can best be assessed by

Options:

A.

assuring that the appropriate processing documentation is changed to reflect the action taken

B.

changing the data collection system to capture the results of the corrective action

C.

redefining the applicable inspection, test, or process control requirements

D.

measuring the results of the corrective action

Buy Now
Questions 19

An engineer has been asked to identify and apply an absolutely objective metric to evaluate risk. The best response is

Options:

A.

an absolutely objective way to measure risk does not exist

B.

lean metrics, because to minimize waste is to minimize risk

C.

six sigma metrics, because a thoroughly controlled process minimizes risk

D.

quality function deployment, to minimize risk as perceived by the customer

Buy Now
Questions 20

A process produces rejects at a rate of 6° o. If multiple samples of 5 are drawn from a population of 100.000. what is the expected number of rejects per sample?

Options:

A.

0.3

B.

30.0

C.

5,000.0

D.

6,000.0

Buy Now
Questions 21

Which of the following elements of a quality system will help reduce errors and defects caused by conflicting work instructions?

Options:

A.

Product specifications

B.

Quality training

C.

Document control

D.

Cross-functional teams

Buy Now
Questions 22

After attempting to prevent or control risk, which of the following types of risk will remain?

Options:

A.

Inherent

B.

Residual

C.

Control

D.

Credit

Buy Now
Questions 23

Accelerated aging of a sterile barrier system is an example of which or the following design verification methods?

Options:

A.

Analyzing

B.

Testing

C.

Demonstrating

D.

Inspecting

Buy Now
Questions 24

Which of the following tools can be used to determine the best option from many choices based on their importance and merits?

Options:

A.

Interrelationship digraph

B.

PERT chart

C.

Tree diagram

D.

Prioritization matrix

Buy Now
Questions 25

Which of the following tools specifies the use of a feedback cycle?

Options:

A.

Flowchart

B.

Cycle-time reduction

C.

Gantt chart

D.

Plan-do-check-act

Buy Now
Questions 26

Which of the following tools is an example of a noncontact measurement tool?

Options:

A.

Laser scanner

B.

Hardness tester

C.

Micrometer

D.

Caliper

Buy Now
Questions 27

Refer to the following FMEA table. The columns labeled S. O. and D. refer to ratings of severity, occurrence, and detection, respectively.

Which potential failure mode is most likely to be seen by a customer?

Options:

A.

No solder

B.

Too much solder

C.

Location of solder

D.

Stringing solder

Buy Now
Questions 28

What is the appropriate number of class intervals for the construction of a histogram generated from 36 observations?

Options:

A.

4

B.

6

C.

8

D.

12

Buy Now
Questions 29

Which of the following charts should be used to monitor leaks in plastic bottles?

Options:

A.

X and R

B.

X and s

C.

P

D.

np

Buy Now
Questions 30

Which of the following statements is always true about an effective design review?

Options:

A.

It occurs when the design is complete.

B.

It is informal in order to brainstorm more ideas.

C.

It is based on defined criteria.

D.

It is conducted by the development team.

Buy Now
Questions 31

A cause and effect diagram is also called which of the following?

Options:

A.

Pareto diagram.

B.

Fishbone diagram.

C.

Boxplot.

D.

Histogram.

Buy Now
Questions 32

When a 24 experiment is fractionated to a 24'5 experiment, the fractioned design is also known as a

Options:

A.

90% fraction

B.

75% fraction

C.

fraction

D.

fraction

Buy Now
Questions 33

Several units from a random sample of units produced on Line 3 were found to be defective. Which of the following actions should be taken next?

Options:

A.

Segregate the defective units

B.

Measure all units produced on the line

C.

Ask someone to disposition the defective units

D.

Measure the units again to confirm they are defective

Buy Now
Questions 34

An engineer is part of a new product team and has found an issue with one of the product's parts. The part's supplier has documented that the part is known to follow a normal distribution, but it has a large variance when produced. The engineer's product design has accounted for variations and incorporated the pan. Which of the following design processes did the engineer follow?

Options:

A.

Design-to-cost

B.

Design for robustness

C.

Axiomatic design

D.

Design for test

Buy Now
Questions 35

Redundancy, versatility and flexibility are all things that can afreet which of the following elements when collecting and summarizing data?

Options:

A.

Descriptive statistics

B.

Data accuracy

C.

Measurement scales

D.

Data collection methods

Buy Now
Questions 36

The sample size for ANSI ASQ Z1.4. Level II plan is based on the

Options:

A.

size of the lot to be inspected

B.

size of the batch to be manufactured

C.

average size of production lots

D.

decision of the quality assurance manager

Buy Now
Questions 37

M in tills drawing, the symbol is being used to indicate the

H Calculator

Options:

A.

minimum material condition

B.

minimum measured condition

C.

maximum material condition

D.

maximum measured condition

Buy Now
Questions 38

The following summary of data represents the amount of time customers spend in a store between the hours of noon and 1:00 p.m. during a one-month period.

Time (minutes)Number of customers

1030

925

815

76

64

535

432

315

242

1 or less50

The summary is an example of which of the following?

Options:

A.

Stem-and-leaf plot

B.

Box plot

C.

Pareto chart

D.

Frequency distribution

Buy Now
Questions 39

A process that is in control has the following characteristics. If the specification is 100 ± 3. what portion of the product is expected to meet specification?

X = 101

R =4 n = 5

H Calculator

Options:

A.

86.7%

B.

93.0%

C.

95.4%

D.

99.7%

Buy Now
Questions 40

Who has primary responsibility for determining the purpose and scope of an audit?

Options:

A.

Client

B.

Auditee

C.

Auditor

D.

Audit manager

Buy Now
Questions 41

The most desirable outcome of a design FMEA (DFMEA) is

Options:

A.

a severity classification matrix I

B.

a reduction in design risk

C.

a comprehensive list of design functions

D.

an estimate of failure frequency

Buy Now
Questions 42

During a daily production meeting, the materials manager discusses a priority shipment that is being delayed due to material being placed on hold from a nonconformance. The process engineer was present when the material was placed on hold and states that the nonconformance will not impact fit. form or function. The manufacturing manager shares that per the ISO standard, the risk should be accepted and the product should be shipped. Which action would be most appropriate for the quality engineer to take first?

Options:

A.

Commit to initiating a deviation and allow the material to ship but complete a corrective action

B.

Commit to completing a corrective action but insist that the material be scrapped since it is nonconforming

C.

Commit to expediting the review and disposition of the nonconforming material with the MRB

D.

Commit to getting approval from the quality manager to allow the material to ship

Buy Now
Questions 43

The primary focus of design FMEA (DFMEA) is to

Options:

A.

identify personnel responsible for implementation

B.

predict failure frequencies

C.

minimize measurement variation

D.

mitigate failure modes

Buy Now
Questions 44

Which of the following types of "voice" is most effective in written communication?

Options:

A.

Active

B.

Passive

C.

Strong

D.

Soft

Buy Now
Questions 45

Working on ail design phases simultaneously is characteristic of

Options:

A.

design for six sigma

B.

design for reliability

C.

quality function deployment

D.

concurrent engineering

Buy Now
Questions 46

When nonconforming items are found, which of the following actions should be taken first?

Options:

A.

A Retest

B.

Destruction

C.

Identification

D.

Return to supplier

Buy Now
Questions 47

Risk control includes making decisions using which of the following pieces of information?

Options:

A.

Acceptable levels of risk

B.

Fault tree analyses results

C.

Check sheet comparisons

D.

Analysis of experiments

Buy Now
Questions 48

Short-run SPC should be used in which of the following situations?

Options:

A.

The coded data being used do not show significant shifts in the process.

B.

Regular SPC charts show the process to be out of control.

C.

Many different parts are made in small lots.

D.

The number of charts currently used needs to be increased to control the process better.

Buy Now
Questions 49

A leak test is performed on every water tank. The production superintendent wants to know the location of each leak on defective tanks. Which of the following tools is most appropriate for collecting this data?

Options:

A.

Pareto diagram

B.

Automatic gauging system

C.

Data coding

D.

Check sheet

Buy Now
Questions 50

Which of the following statements is true about the average outgoing quality limit (AOQL)?

Options:

A.

It is the replacement measure for the acceptance quality limit (AQL).

B.

It assumes screening and replacement of nonconforming units.

C.

It cannot be used to define the Dodge-Romig defect acceptance number.

D.

It can be used instead of ANSI ASQ Z1.4 single sampling plans.

Buy Now
Questions 51

Which of the following activities is a critical component of the closing meeting of an external audit?

Options:

A.

Determining appropriate corrective actions to take

B.

Establishing the date for a follow-up audit

C.

Distributing the final audit report

D.

Providing an explanation of the findings

Buy Now
Questions 52

Which of the following information should be contained in work instructions?

Options:

A.

Training requirements

B.

Production cost formulas

C.

Design review formulas

D.

Equipment needed to do the work

Buy Now
Exam Code: CQE
Exam Name: Certified Quality EngineerExam
Last Update: Nov 24, 2024
Questions: 175
CQE pdf

CQE PDF

$25.5  $84.99
CQE Engine

CQE Testing Engine

$30  $99.99
CQE PDF + Engine

CQE PDF + Testing Engine

$40.5  $134.99